Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Muchia Singabad Road From 5.00 Km To 7.00 Km In Stretches Potholes Repairing Work Under Malda Highway Division In The District Of Malda.
|
| Description |
Muchia Singabad Road From 5.00 Km To 7.00 Km In Stretches Potholes Repairing Work Under Malda Highway Division In The District Of Malda.
|
| Organisation | PW(ROADS)(SH) | State Govt. and UT |
| Tender Id | 2025_SH_835236_2 |
|
Reference Number |
eNIT-01/2025-26/AE/GHSD/PW(R)D |
| Tender Fee | 0 |
| EMD | 9647 |
| Tender Value | - |
| Place | GAZOLE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1861148 |
| Start Date | April 10, 2025 00:25 |
| End Date |
Expired
25/04/2025
Expired 536 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renovation /up-gradation of bop elements outlived more than 20 years, 06 nos pcvr each at bop adampur, bop muchia, bop sukhnagar , bop ashrafpur, bop kumarpur and bop tilason of 12 bn bsf under shq bsf malda.
Renovation /up-gradation of bop elements outlived more than 20 years, 06 nos pcvr each at bop adampur, bop muchia, bop sukhnagar , bop ashrafpur, bop kumarpur and bop tilason of 12 bn bsf under shq bsf malda.
Read morePmc services for dpr pre constr activities supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Read moreOverlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Read moreSurfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Surfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Read moreRaising and improvement of the major district road connecting arabhavichallakere state highway45 to shingalapur thakke lolasur basaligundi nallanatti balobal biranagaddi and hunashyal p.g. to join sankeshwar sangam state highway 44 near vaderahatti, from km 5.00 to km 6.25 and constructing a bridge at km 5.86 near lolasur ingokak taluk of belagavi district.
Raising and improvement of the major district road connecting arabhavichallakere state highway45 to shingalapur thakke lolasur basaligundi nallanatti balobal biranagaddi and hunashyal p.g. to join sankeshwar sangam state highway 44 near vaderahatti, from km 5.00 to km 6.25 and constructing a bridge at km 5.86 near lolasur ingokak taluk of belagavi district.
Read moreBulbulchandi katlapukur road from 4.00 km. to 7.00 km. in stretches potholes repairing work under malda highway division in the district of malda.
Bulbulchandi katlapukur road from 4.00 km. to 7.00 km. in stretches potholes repairing work under malda highway division in the district of malda.
Read moreMirzapur banshihari road from 8.00 km. to 10.00 km. in stretches potholes repairing work under malda highway division in the district of malda.
Mirzapur banshihari road from 8.00 km. to 10.00 km. in stretches potholes repairing work under malda highway division in the district of malda.
Read moreAdina to chakli road from 25.66 km to 29.00 km in stretches potholes repairing work under malda highway division in the district of malda.
Adina to chakli road from 25.66 km to 29.00 km in stretches potholes repairing work under malda highway division in the district of malda.
Read moreAdina to chakli road from 30.50 km to 33.62 km in stretches potholes repairing work under malda highway division in the district of malda.
Adina to chakli road from 30.50 km to 33.62 km in stretches potholes repairing work under malda highway division in the district of malda.
Read moreMuchia - singabad road vr from 2.200 km to 2.900 km, 3.000 km to 3.800 km, 4.000 km to 4.750 km, 5.000 km to 5.600 km, 6.000 km to 6.850 km, 7.100 km to 8.000 km in stretches, patch repairing works under malda highway division in the dist of malda
Muchia - singabad road vr from 2.200 km to 2.900 km, 3.000 km to 3.800 km, 4.000 km to 4.750 km, 5.000 km to 5.600 km, 6.000 km to 6.850 km, 7.100 km to 8.000 km in stretches, patch repairing works under malda highway division in the dist of malda
Read moreof your Industry type