Tender Details
Particulars | Details |
---|---|
Title |
Hiring Agency/Firm For Development And Construction Of Fountaion Structure And Water Fall Structure In Vrindavan Garden Manasa
|
Description |
Hiring Agency/Firm For Development And Construction Of Fountaion Structure And Water Fall Structure In Vrindavan Garden Manasa
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2295 |
EMD | 5000 |
Tender Value | |
Place | Manasa |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 23:00 |
End Date |
20/06/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreAAAAAAAAAA
Login to viewRfp for consultancy services for preparation of dpr and providing pre-construction services in respect to up gradation of existing 2l to 4l plus ps agartala to udaipur section of nh-08 and udaipur to amarpur
Read moreConsultancy services for construction of jharsuguda bypass including rob including land acquisition on nh-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of odisha.
Consultancy services for construction of jharsuguda bypass including rob including land acquisition on nh-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of odisha.
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreConstruction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreof your Industry type