Title
Earth Excavation Work,Brick Masonry Below Plinth,Brick Masonry Above Plinth,Rcc Plinth,Rcc Roof,Ste
Description
Organisation Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas
Tender Id GEM/2023/B/4120718
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date October 21, 2023 17:49
End Date
Expired 06/11/2023

Expired 1072 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

ELIDE ENTERPRISES

Contract Value

2486024

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Buyer Name: Deepak Joshi
Ministry: Ministry Of Petroleum And Natural Gas
Department: Bharat Petroleum Corporation Ltd
Organisation: Bharat Petroleum Corporation Ltd

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 BUYBUY TECHNOLOGIES PRIVATE LIMITED - 06-11-2023 00:11:53 MSE Qualified
2 ELE-MECH ENGINEERING SERVICES - 05-11-2023 23:27:21 MSE Qualified
3 ELIDE ENTERPRISES - 05-11-2023 11:58:32 MSE Qualified
4 KISHAN SINGH CONTRACTOR - 05-11-2023 11:11:06 MSE Qualified
5 R P CONTRACTORS - 30-10-2023 21:09:57 MSE Qualified
6 R.P. CONSTRUCTIONS - 06-11-2023 08:57:01 MSE Qualified
7 RAVINDRA CONTRACTOR - 06-11-2023 08:40:22 MSE Qualified
8 VEECONS INTERNATIONAL - 06-11-2023 07:55:24 MSE Qualified
9 Vimal Enterprises - 05-11-2023 11:44:50 MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 ELIDE ENTERPRISES(MSE)( MSE Social Category:OBC ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 2486024.00 L1
2 R P CONTRACTORS (MSE)( MSE Social Category:OBC ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 2672250.00 L2
3 Vimal Enterprises( MSE Social Category:General ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 3504287.41 L3
4 RAVINDRA CONTRACTOR (MSE)( MSE Social Category:General ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 3552008.00 L4
5 VEECONS INTERNATIONAL (MSE)( MSE Social Category:General ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 3576710.00 L5
6 KISHAN SINGH CONTRACTOR (MSE)( MSE Social Category:General ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 3583933.00 L6
7 BUYBUY TECHNOLOGIES PRIVATE LIMITED (MSE)( MSE Social Category:General ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 3683000.00 L7
8 R.P. CONSTRUCTIONS (MSE)( MSE Social Category:OBC ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 3773600.00 L8
9 ELE-MECH ENGINEERING SERVICES (MSE)( MSE Social Category:SC ) Item Categories : EARTH EXCAVATION WORK,BRICK MASONRY BELOW PLINTH,BRICK MASONRY ABOVE PLINTH,RCC PLINTH,RCC ROOF,STE 5318821.00 L9

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
EARTH EXCAVATION WORK NA BOQ Item 100 ₹ 16520.000
BRICK MASONRY BELOW PLINTH NA BOQ Item 30 ₹ 177000.000
BRICK MASONRY ABOVE PLINTH NA BOQ Item 70 ₹ 495600.000
RCC PLINTH NA BOQ Item 30 ₹ 141600.000
RCC ROOF NA BOQ Item 25 ₹ 265500.000
STEEL REINFORCEMENT NA BOQ Item 3500 ₹ 351050.000
PCC PLINTH NA BOQ Item 20 ₹ 94400.000
FINISHED AND POLISHED RED STONE 25MM NA BOQ Item 200 ₹ 188800.000
FINISHING POLISHED DHOLPUR OR JODHPUR 25MM NA BOQ Item 100 ₹ 94400.000
CERAMIC TILES 8MM NA BOQ Item 25 ₹ 35400.000
BLD PNT EMULSION PAINTING WORKS NA BOQ Item 500 ₹ 44250.000
ROOF TREATMENT NA BOQ Item 100 ₹ 35400.000
CONCRETE CHEQ TILES NA BOQ Item 50 ₹ 29500.000
AL PARTITION POWDER NA BOQ Item 300 ₹ 123900.000
LAMINATED BOARD 18MM NA BOQ Item 50 ₹ 26550.000
LOUVER GLASS POWDER NA BOQ Item 50 ₹ 32450.000
CEMENT PLASTER NA BOQ Item 700 ₹ 181720.000
DOOR CLOSER OVERHEAD NA BOQ Item 1 ₹ 1770.000
SOAK PIT NA BOQ Item 1 ₹ 29500.000
SEPTIC TANK 50 PERS NA BOQ Item 1 ₹ 7080.000
Similar Tenders
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha

Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha

Read more
Estimate for lining/relining of w/c by using brick masonry or underground rcc pipeline of outlet rd 32275/l ofattalan minor .

Estimate for lining/relining of w/c by using brick masonry or underground rcc pipeline of outlet rd 32275/l ofattalan minor .

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay

Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-ii)

Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-ii)

Read more
Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-i)

Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-i)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Dismantl brick mason,dismantl rcc,excv less than 3 rck dis out,s and f coarse sand,rcc plin 1 is to 1 5 is to 3 cs,rcc ab pl 1 is to 1 5 is to 3 cs,rcc roof 1 is to 1 5 is to 3 cs,brk msn pl cs cl75,brk msn ab pl cs c75,sl dpc coarse sand,steel reinforcement,plaster 18mm cs 1 is to 5,plaster 12mm cs 1 is to 5,neat cement punning,plaster 6mm cs 1 is to 4,vitrified 600x600x10,vitrified 600x600x10,granite flooring,louver glass powder,toughened glass 12mm,al partition powder,al section powder,led 2x2 reces 36w nw,db 32a elcb 100 ma,pvc conduit 32mm,pvc conduit 25mm,pvc conduit wall40mm,pvc conduit wall25mm,pt wire 3 4mm2,pt wire 3 2 5mm2,gi box 2 mod switch,gi box 3 mod switch,rec gi box 150x75x60,gi box 6 mod switch,gi box 12 mod switch,mod switch 5a,mod socket 5a,mod telephone socket,mod rj45 socket,cat6 cable,mod switch 15a,mod socket 15a,mcb switch sockets,split ac 2t

Dismantl brick mason,dismantl rcc,excv less than 3 rck dis out,s and f coarse sand,rcc plin 1 is to 1 5 is to 3 cs,rcc ab pl 1 is to 1 5 is to 3 cs,rcc roof 1 is to 1 5 is to 3 cs,brk msn pl cs cl75,brk msn ab pl cs c75,sl dpc coarse sand,steel reinforcement,plaster 18mm cs 1 is to 5,plaster 12mm cs 1 is to 5,neat cement punning,plaster 6mm cs 1 is to 4,vitrified 600x600x10,vitrified 600x600x10,granite flooring,louver glass powder,toughened glass 12mm,al partition powder,al section powder,led 2x2 reces 36w nw,db 32a elcb 100 ma,pvc conduit 32mm,pvc conduit 25mm,pvc conduit wall40mm,pvc conduit wall25mm,pt wire 3 4mm2,pt wire 3 2 5mm2,gi box 2 mod switch,gi box 3 mod switch,rec gi box 150x75x60,gi box 6 mod switch,gi box 12 mod switch,mod switch 5a,mod socket 5a,mod telephone socket,mod rj45 socket,cat6 cable,mod switch 15a,mod socket 15a,mcb switch sockets,split ac 2t

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise