Tender Details

Particulars Details
Title
Mtps I Tm Unit I Cleaning Hydraulic Testing Of Lub Oil Coolers Working Oil Coolers Dismantling Cleaning And Assembling Of Suction Strainers Of Bf Ps Ce Ps Renewal Of Bfp Leak Off Line And Suction Discharge Flange Gaskets
Description
Mtps I Tm Unit I Cleaning Hydraulic Testing Of Lub Oil Coolers Working Oil Coolers Dismantling Cleaning And Assembling Of Suction Strainers Of Bf Ps Ce Ps Renewal Of Bfp Leak Off Line And Suction Discharge Flange Gaskets
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_556050_1
Reference
Number
CE / MTPS-I / SE / M-I / TM /OT. 94 / 2025-26
Tender Fee 0
EMD 4100
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=664236
Start Date May 12, 2025 14:30
End Date

26/05/2025 ( Expired 7 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Read more
Mtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26

Mtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26

Read more
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop

Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop

Read more
Mtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work

Mtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work

Read more
Mtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type airdrie

Mtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type air drie

Read more
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps

Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps

Read more
Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets

Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets

Read more
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Read more
Mtps i tm unit i to iv dismantling cleaning and assembling of main oil tank filters and centrifuges bowl assembly during 2024 25 for a period of one year from the date of commencement

Mtps i tm unit i to iv dismantling cleaning and assembling of main oil tank filters and centrifuges bowl assembly during 2024 25 for a period of one year from the date of commencement

Read more
Mtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a

Mtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise