Tender Details
Particulars | Details |
---|---|
Title |
Group A Bt Renewal Of 1 Devarda Bhelsi Road 3.00 Km 2 Minoura Approach Road 2.00 Km 3 Kudeshwar Diet Approach Road 1.00 Km 4 Digora Nadiya Road 6.00 Km 5 Majna Digora Road15.40 Km
|
Description |
Group A Nit For Bt Renewal Of 1 Devarda Bhelsi Road 3.00 Km 2 Minoura Approach Road 2.00 Km 3 Kudeshwar Diet Approach Road 1.00 Km 4 Digora Nadiya Road 6.00 Km 5 Majna Digora Road 15.40 Km
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_306458_1 |
Reference Number |
13/2023-24 |
Tender Fee | 15000 |
EMD | 3.04 Lakh |
Tender Value | |
Place | CHIEF ENGINEER OFFICE PWD SAGAR M.P. |
Link | https://mptenders.gov.in |
Start Date | September 13, 2023 16:00 |
End Date |
22/09/2023 ( Expired 626 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreConstruction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Read moreWidening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Widening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreUnder state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreAnnual rate of contract for replacement of sewer line and manhole, treated water disposal line, providing and raising of manhole cover in alampur, milakpur, khijuriwas, nangalia, bhiwari gaon, rhb sec. 1, 2, 3, 4, 7, uit sector 5, gh 6 and near exis
Annual rate of contract for replacement of sewer line and manhole, treated water disposal line, providing and raising of manhole cover in alampur, milakpur, khijuriwas, nangalia, bhiwari gaon, rhb sec. 1, 2, 3, 4, 7, uit sector 5, gh 6 and near exis
Read moreof your Industry type