Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Resurfacing Of Alley Road Inside Mobile Crane Scanner With Heavy Duty Paver Block Topping Of Grade M 55 From Cgr Road Crossing Near 8 No Nsd Gate To Gate Near Dtcs.
|
| Description |
Resurfacing Of Alley Road Inside Mobile Crane Scanner With Heavy Duty Paver Block Topping Of Grade M 55 From Cgr Road Crossing Near 8 No Nsd Gate To Gate Near Dtcs.
|
| Organisation | Kolkata Port Trust | Central Govt. Ministry/Department |
| Tender Id | 2024_KoPT_822724_1 |
|
Reference Number |
SMPK/KDS/CIV/T/2870/52 |
| Tender Fee | 1770 |
| EMD | 1.4 Lakh |
| Tender Value | - |
| Place | NS Dock |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=864622 |
| Start Date | August 27, 2024 19:30 |
| End Date |
Expired
18/09/2024
Expired 761 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Resurfacing the existing black topping road outside main gate from token gate to turning reach 1 at ttps
Resurfacing&#x0d the existing black topping road outside main gate from token&#x0d gate to turning reach 1 at ttps
Read moreResurfacing the existing black topping road outside main gate from main first gate to turning reach 3 at ttps
Resurfacing&#x0d the existing black topping road outside main gate from main&#x0d first gate to turning reach 3 at ttps
Read moreResurfacing the existing black topping road outside main gate from main second gate to turning reach 2 at ttps
Resurfacing&#x0d the existing black topping road outside main gate from main&#x0d second gate to turning reach 2 at ttps
Read moreRectification works by attending patch up to the existing damaged 70 s road from main gate to 140 m and resurfacing the existing black topping road at ttps
Rectification works&#x0d by attending patch up to the existing damaged 70 s road from&#x0d main gate to 140 m and resurfacing the existing black topping&#x0d road at ttps
Read moreRectification works by attending patch up to the existing damaged 302.5 w road from store main gate to 263 s road and resurfacing the existing black topping road at ttps
Rectification works&#x0d by attending patch up to the existing damaged 302.5 w road&#x0d from store main gate to 263 s road and resurfacing the&#x0d existing black topping road at ttps
Read moreRectification works by attending patch up to the existing damaged 70 s road from main gate 140 m to 360 m and resurfacing the existing black topping road at ttps
Rectification works&#x0d by attending patch up to the existing damaged 70 s road from&#x0d main gate 140 m to 360 m and resurfacing the existing black topping road at ttps
Read moreResurfacing the existing black topping road in front of scrap store and ware house west side road and store main road from main gate up to 30 m at ttps
Resurfacing&#x0d the existing black topping road in front of scrap store and ware&#x0d house west side road and store main road from main gate up to&#x0d 30 m at ttps
Read moreRectification works by attending patch up to the existing damaged 70 s road ch 360 m to 390 m from main gate and 90 w road up to 175 s road and resurfacing the existing black topping road at ttps
Rectification works&#x0d by attending patch up to the existing damaged 70 s road ch&#x0d 360 m to 390 m from main gate and 90 w road up to 175 s road&#x0d and resurfacing the existing black topping road at ttps
Read moreof your Industry type