Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cement Concrete Road In Alibag Region Under Extd Muip Pkg 3
|
| Description |
Construction Of Cement Concrete Road In Alibag Region Under Extd Muip Pkg 3
|
| Organisation | Mumbai Metropolitan Region Development Authority | State Govt. and UT |
| Tender Id | 2024_MMRDA_1088436_1 |
|
Reference Number |
ED/MMRDA/Alibaug MUIP/24/PKG3 |
| Tender Fee | 4040 |
| EMD | 2.04 Lakh |
| Tender Value | |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1899584 |
| Start Date | September 20, 2024 23:30 |
| End Date |
Expired
03/10/2024
Expired 663 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreMaintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based
 maintenance contract in the state of uttar pradesh.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConstruction of cement concrete road in alibag region under extd muip pkg 2
Construction of cement concrete road in alibag region under extd muip pkg 2
Read moreConstruction of cement concrete road in alibag region under extd. muip pkg1
Construction of cement concrete road in alibag region under extd. muip pkg1
Read moreConstruction of 03 cement concrete roads in kalyan dombivali municipal area under extd muip
Construction of 03 cement concrete roads in kalyan dombivali municipal area under extd muip&#x0d
Read moreof your Industry type