Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning Of Kitchen Duct In Visitor Hostel
|
| Description |
Cleaning Of Kitchen Duct In Visitor Hostel
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_IISRM_763166_1 |
|
Reference Number |
IISER/23-24/EE-EO/RFQ-12 |
| Tender Fee | 0 |
| EMD | 900 |
| Tender Value | - |
| Place | IISER MOHALIA |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 22, 2023 16:30 |
| End Date |
Expired
28/07/2023
Expired 1171 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Contract for repair, replacement and restoration of 6.6 kv 1ba bus duct
Contract for repair, replacement and restoration of 6.6 kv 1ba bus ductof unit-1, vstps
Read moreHostel conversion into ashram school for govt. post matric college hostel for (b) at nirmal (v) of nirmal (m) in nirmal district
Hostel conversion into ashram school for govt. post matric college hostel for (b) at nirmal (v) of nirmal (m) in nirmal district
Read moreUp-keeping of wash rooms, water closets etc., for spf hostel and g+4 project hostel buildings for the period from october 2026 to march 2027
Up-keeping of wash rooms, water closets etc., for spf hostel and g+4 project hostel buildings for the period from october 2026 to march 2027
Read moreMajor and minor repairs to st boys hostel at rajendranagar in rangareddy district
Major and minor repairs to st boys hostel at rajendranagar in rangareddy district
Read moreProviding repairs to govt., st boys hostel at nagaram in medchal malakajgiri district
Providing repairs to govt., st boys hostel at nagaram in medchal malakajgiri district
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreConstruction of additional hostel (g+2 floors) for girls at agricultural college, polasa, jagtial.
Construction of additional hostel (g+2 floors) for girls at agricultural college, polasa, jagtial.
Read moreMajor and minor repairs to govt., st boys hostel at shivapoor in kamareddy district
Major and minor repairs to govt., st boys hostel at shivapoor in kamareddy district
Read moreConstruction of drain and laying pipe from b c m hostel to anand badai house
Construction of drain and laying pipe from b c m hostel to anand badai house
Read moreHostel conversion into ashram school at stbh (spl) hanamkonda of hanamkonda (m) in hanamkonda district
Hostel conversion into ashram school at stbh (spl) hanamkonda of hanamkonda (m) in hanamkonda district
Read moreof your Industry type