Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Shifting, Relaying And Fitting Of 10/8/6 Inch Dia. Ms Pipe Line As Well As Changing Of Foot Valve/ Sluice Valve/Nrv/Jetting Hose Etc., Dismantling And Shifting Of Different Pumps, Float Shifting And Delivery Extension/ Shortening Etc
|
| Description |
Dismantling, Shifting, Relaying And Fitting Of 10/8/6 Inch Dia. Ms Pipe Line As Well As Changing Of Foot Valve/ Sluice Valve/Nrv/Jetting Hose Etc., Dismantling And Shifting Of Different Pumps, Float Shifting And Delivery Extension/ Shortening Etc
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2026_MCL_358057_1 |
|
Reference Number |
MCL/GM/HA/EnM/ e-Tender/26-27/207 Dt. 06.04.26 |
| Tender Fee | 0 |
| EMD | 1.14 Lakh |
| Tender Value | - |
| Place | BALRAM OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=370942 |
| Start Date | April 08, 2026 15:30 |
| End Date |
Expired
23/04/2026
Expired 137 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc
Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc
Read moreNrv 50mm make vri ramco zoloto,float valve 20mm make prayag shakti cera,float vavle 15mm make praya
Read more
Repairing replacement overhauling / and dismantling transporting of nrv and sluice valve of nrv 10inch -3sluice valve 10inch -3 nrv 8inch 2,sluice valve 8inch -2 at akwmc, katras area
Repairing 
 replacement 
 overhauling 
 / 
 and 
 dismantling 
 transporting of nrv 
 and sluice valve of 
 nrv 10inch -3sluice 
 valve 10inch -3 nrv 8inch
 2,sluice valve 8inch -2 at 
 akwmc, katras area
Read moreDismantling manual tranporting and repairing of nrv and sluice valve of nrv 10inch-3 nos.sluice valve 10inch -3 nrv 8inch -2 nos.sluice valve 8inch-2 nos.at akwmc katras area
Dismantling 
 manual 
 tranporting and 
 repairing of nrv and 
 sluice valve of 
 nrv 10inch-3 
 nos.sluice valve 
 10inch -3 nrv 8inch -2 
 nos.sluice valve 
 8inch-2 nos.at akwmc 
 katras area
Read moreDismantling and shifting of workshop shed etc under rohini project, nk area.
Dismantling and shifting of workshop shed etc under rohini project, nk area.
Read moreRepairing of different size of sluice valve, nrv etc before monsoon in jhingurda project.
Repairing of different size of sluice valve, nrv etc before monsoon in jhingurda project.
Read moreRepairing of different size of sluice valve, nrv etc before monsoon in jhingurda project
Repairing of different size of sluice valve, nrv etc before
 monsoon in jhingurda project
Read moreSupply of 70 nos.of 10 inch flange including making of short piecess 5 no.tapper etc.at akwmc ocp.(2) dismantling and repairing of nrv sluice valve of nrv 10imc-12 sluice valve 10inch-10 nrv 8inch-6 sluice
Supply of 70 nos.of 10 inch flange including making of short piecess 5 no.tapper etc.at akwmc ocp.(2) dismantling and repairing of nrv sluice valve of nrv 10imc-12 sluice valve 10inch-10 nrv 8inch-6 sluice
Read more(1) supply of 70 nos.of 10 inch flange including making of short piecess 5 no.tapper etc.at akwmc ocp.(2) dismantling and repairing of nrv sluice valve of nrv 10imc-12 sluice valve 10inch-10 nrv 8inch-6 sluice
(1) supply of 70 nos.of 10 
 inch 
 flange including 
 making of short piecess 5 
 no.tapper etc.at akwmc 
 ocp.(2) 
 dismantling and
 repairing of nrv sluice 
 valve of nrv 10imc-12 sluice 
 valve 10inch-10 nrv 8inch-6 sluice
Read moreDismantling an installation of pump, shifting of geb, shifting, installation of return pulley, extension of delivery line, lowering of haulage, shifting, changing of pump, transporting, loading, unloading of 70 sq mm 250 mtr cable, changing of gear
Dismantling an installation of pump, shifting of geb, shifting, installation of return pulley, extension of delivery line, lowering of haulage, shifting, changing of pump, transporting, loading, unloading of 70 sq mm 250 mtr cable, changing of gear
Read moreof your Industry type