Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Bd355 Dozer Sl.No. 11906 And Ekg5 A Shovel Sl.No. 562 Of Urimari Ocp
|
| Description |
(A) Repairing Of Holes Of Both Side 
Sprocket Segment Hub, Drive Line Assy. And Brake Band Assy. Along With Replacement Of 06 Nos.Track Shoes Of Bd355, Sl.No.11906 And (B) Repairing Of Trip Gearbox And 01 No. Driving Wheel (In Float) Of Ekg5 A 562.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_335530_1 |
|
Reference Number |
PE(X)/Excv/e-Tender/25-26/03 Dtd- 15/05/25 |
| Tender Fee | 0 |
| EMD | 3100 |
| Tender Value | - |
| Place | Urimari OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347819 |
| Start Date | May 17, 2025 16:30 |
| End Date |
Expired
27/05/2025
Expired 504 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of tarpalin for shovel section rg ocp-iii rg-ii area
Procurement of tarpalin for shovel section rg ocp-iii rg-ii area
Read moreProcurement of kirloskar make 12bhp ta2 engine spares for shovel selection ocp-iii rg-ii on open enquiry basis
Procurement of kirloskar make 12bhp ta2 engine spares for shovel selection ocp-iii rg-ii on open enquiry basis
Read moreProcurement of ashok leyland make 1618 and 1920 model mobile service can spares for shovel section ocp-iii, rg-ii on open enquiry basis
Procurement of ashok leyland make 1618 and 1920 model mobile service can spares for shovel section ocp-iii, rg-ii on open enquiry basis
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreReplacement of undercarriage assembly and repairing of lhs track frame of bd355 dozer si.no-11906 of urimari ocp
Replacement of undercarriage assembly and repairing of lhs track frame of bd355 dozer si.no-11906 of urimari ocp
Read moreRepairing of hoist drum assy. etc. of ekg5a shovel 562, repl. of complete undercarriage etc. of rel c-650d drill 708 and repairing of 03 nos. radiator bd355 dozer 11906, idm30 drill 852, and rel c-650d drill 708 of urimari ocp.
Repairing of hoist drum assy. etc. of ekg5a shovel 562, repl. of complete undercarriage etc. of rel c-650d drill 708 and repairing of 03 nos. radiator bd355 dozer 11906, idm30 drill 852, and rel c-650d drill 708 of urimari ocp.
Read moreRepairing of crowd mechanism of ekg5a shovel sl no.562 of urimari project.
Repairing of crowd mechanism of ekg5a shovel sl no.562 of urimari project.
Read moreRepairing of ekg5a shovel 562
Repairing/wiring from hoist generator to dc panel, dc panel to hoist motor and magnetic amplifer hoist unit for ekg5a shovel sl.no. hmb562 of urimari ocp
Read moreof your Industry type