Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Echp I Reconditioning Of Worn Out Gear Box Scn 450 Released From Conveyor 43.
|
| Description |
Echp I Reconditioning Of Worn Out Gear Box Scn 450 Released From Conveyor 43.
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_585848_1 |
|
Reference Number |
CE/SE/MI/TTPS/113/2025-2026 |
| Tender Fee | 0 |
| EMD | 7200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=699832 |
| Start Date | July 26, 2025 17:30 |
| End Date |
Expired
11/08/2025
Expired 432 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreIchp-replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-49
Ichp-replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-49
Read moreRebabbitting of 2sets of worn out turbine guide bearing released from bhavani barrage power house2umaipalayam at erode generation circle
Rebabbitting of 2sets of worn out turbine guide bearing released from bhavani barrage power house2 umaipalayam at erode generation circle
Read moreEchp-i- replacing the existing wornout skirt board assembly by new skirt board assembly for conveyor-43 at pch-i.
Echp-i- replacing the existing wornout skirt board assembly by new skirt board assembly for conveyor-43 at pch-i.
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreEchp-i-overhauling load testing of 7.5 t, 5 t 2 t capacity chain block at conveyor 43, 46, bfd 9a, 9b and reject conveyor-1 at pch-i
Echp-i-overhauling load testing of 7.5 t, 5 t 2 t capacity chain block at conveyor 43, 46, bfd 9a, 9b and reject conveyor-1 at pch-i
Read moreMtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Read moreTtps es em iii replacement of worn out area of gi earth flat by new earth flat size 50 x 10 mm and reconditioning of earth pits in esp iv area of unit iv
Ttps es em iii replacement of worn out area of gi earth flat by new earth flat size 50 x 10 mm and reconditioning of earth pits in esp iv area of unit iv
Read moreTaking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Read moreEchp-i- reconditioning of worn out gear box scn-450 released from conveyor-43.
Echp-i- reconditioning of worn out gear box scn-450 released from conveyor-43.
Read moreof your Industry type