Tender Details

Particulars Details
Title
Construction Of Cc Drain From Sk Mastan House (P.No.2 W/14) To Pole No.2 W/12 And Pole No. 2 W/12 To Pole No.2 W/11 In 2nd Ward In Tiruvuru Nagara Panchyat.
Description
Construction Of Cc Drain From Sk Mastan House (P.No.2 W/14) To Pole No.2 W/12 And Pole No. 2 W/12 To Pole No.2 W/11 In 2nd Ward In Tiruvuru Nagara Panchyat.
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 137
EMD 3900
Tender Value
Place AP
Link

AAAAAAAAAA

Login to view
Start Date May 26, 2025 21:30
End Date

09/06/2025 ( 11 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Read more
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Const. of cc rd and rcc drain in ward 14 from krishnapuram gate to naresh soni up to lokesh awasthi house

Const. of cc rd and rcc drain in ward 14 from krishnapuram gate to naresh soni up to lokesh awasthi house

Read more
Construction of c.c. road and r.c.c. drain from kallu patel to arvind tiwari in gandhi ward, nagar palika parishad, gotegaon

Construction of c.c. road and r.c.c. drain from kallu patel to arvind tiwari in gandhi ward, nagar palika parishad, gotegaon

Read more
Construction of cc road, cc drain, cc chauk in slum wards (ward no. 1, 5 and 15) under ashray shulk nidhi tonkkhurd dewas m.p.

Construction of cc road, cc drain, cc chauk in slum wards (ward no. 1, 5 and 15) under ashray shulk nidhi tonkkhurd dewas m.p.

Read more
Handling and conveyance of cement from vartak store cell (vsc), tezpur to various locations in aor of 14 brtf under project vartak

Handling and conveyance of cement from vartak store cell (vsc), tezpur to various locations in aor of 14 brtf under project vartak

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise