Tender Details

Particulars Details
Title
Nhidcl/Nagaland/Civil Work /Kohima Jessami /Pkg V
Description
Balance Work Of Construction Of Two Lane With Hard Shoulders Of Kohima Jessami Road On Nh 29 From Existing Km 98.38 To Existing Km 120.367 (Design Km 95.70 To Km 117.20) Design Length 21.50 Km (Pkg V) 2nd Call
Organisation Central Public Procurement Portal 1
Tender Id 2023_NHIDC_760523_1
Reference
Number
NHIDCL/Nagaland/Civil Work /Kohima-Jessami /Pkg-V
Tender Fee 23600
EMD 1.18 Crore
Tender Value -
Place NHIDCL HQ New Delhi
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date July 21, 2023 20:30
End Date
Expired 14/08/2023

Expired 1161 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Nhidcl/ ar.pr./h-a/pkg-i/ mjb/28.200/2026

Construction of major bridge at design ch. 28.200 of hunli-anini road (nh-313) in the state of arunachal pradesh on epc mode under sardp

Read more

Emergent maintenance of the existing road of the project construction of 2 laning with hard shoulder of ukhrul tolloi tadubi section of nh 102a from design chainage km 81.870 to km 105.825 pkg 4 at the risk and cost of the epc contractor 3rd call

Read more
Nhidcl/ro-agt/stmc/risk cost/nh-108b nh-208/p-i,ii,iv,v/2026-27/783

Restoration works at the risk and cost of the epc contractor through stmc in the state of tripura during fy 2026 27 on percentage rate and work order basis 3rd call for the following road stretches kailashahar khowai package i kailashahar khowai pack

Read more

Emergent repair work of nh 02 stretch from existing ch. km 253.300 karong bridge start point to km 258.100 senapati traffic point total length 4.800 km in the state of manipur in the year 2026-27

Read more

Construction of 4 lane twin tube road cum rail underwater tunnel under river brahmaputra, including 4 lane approaches along with provision of railway infrastructure in one of the tubes, in the state of assam on epc mode

Read more
Nhidcl/manipur/ 2025/mao-senapati/ strenthening/aafs/

Strengthening of mao to senapati section of old nh-39 (new nh-02) from existing chainage km 212.328 (mao gate) to km 264.313 (taphou kuki) in the state of manipur on epc mode (total length 51.985 km).

Read more
Nhidcl/assam/2025 /baihatachariali to missionchariali /260456

Construction of 4 lane highway from baihata chariali (ch. 0.000), near guwahati to tezpur (ch. 150.971) excluding mangaldoi bypass (from ch. 28.500 to ch.42.590) along nh-15 in the state of assam on bot toll mode.

Read more

Widening and development of existing carriageway into 2lane with paved shoulder configuration along with construction of tunnels, viaducts and treatment of vulnerable sliding/sinking zones along nh10 from km 53.50 rangpo to km 79.371 ranipool

Read more

Onsultancy services for authority engineer ae for supervision of pango jorging, singa anleye, kamlang t junction deban and kharsang miao vijaynagar packages of frontier highway nh 913 in arunachal pradesh.

Read more

Construction of uni-directional singhpora - vailoo twin tube tunnel (under sinthan pass) and its approach roads on kishtwar - vailoo - khanabal section of nh-244 in the union territory of jammu and kashmir on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise