Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Extension Of Ground Floor Including Brick Work And Finishing Work Of Existing Ground Floor Frame Structure And Proposed 1st Floor Construction Work For Conservancy Purpose Under Swm Near Municipal Office Building Ward No 10 Under Nalhati Municipality
|
| Description |
Extension Of Ground Floor Including Brick Work And Finishing Work Of Existing Ground Floor Frame Structure And Proposed 1st Floor Construction Work For Conservancy Purpose Under Swm Near Municipal Office Building Ward No 10 Under Nalhati Municipality
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_MAD_556620_6 |
|
Reference Number |
02 of 2023-24 |
| Tender Fee | 0 |
| EMD | 70586 |
| Tender Value | - |
| Place | NALHATI |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | August 12, 2023 15:30 |
| End Date |
Expired
05/09/2023
Expired 1138 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and installation of electronic signage board with structure frame and acp surface under swm project under swm project at kaliyaganj municipality uttar dinajpur
Supply and installation of electronic signage board with structure frame and acp surface under swm project under swm project at kaliyaganj municipality uttar dinajpur
Read moreRepair and maintenance of ground floor ws-06 and first floor ws-106, ws-107 and roof old structure building in the university polytechnic premises at jamia millia islamia.
Repair and maintenance of ground floor ws-06 and first floor ws-106, ws-107 and roof old structure building in the university polytechnic premises at jamia millia islamia.
Read moreEarth excavation,cement,brick work,brick work with burnt clay,wood work for doors and frame,glazed wall tiles,glazed floor tiles,pvc door,wash basin,waste pipe,water closquatting pan,cpvc pipe,rigid pvc pipe,upvc moulded pipe,upvc moulded accessories,construction of septic tank
Earth excavation,cement,brick work,brick work with burnt clay,wood work for doors and frame,glazed wall tiles,glazed floor tiles,pvc door,wash basin,waste pipe,water closquatting pan,cpvc pipe,rigid pvc pipe,upvc moulded pipe,upvc moulded accessories,construction of septic tank
Read moreSite preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreSteel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Steel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreAcc brick,door and window,profile sheet,tube light,ms structure frame,electrification,toilet,floor
Read more
Acc brick,door and window,profile sheet,tube light,ms structure frame,electrification,toilet,floor
Read more
Construction of ground floor rcc frame structure of piyoli phukon stadium complex, part-v, sivasagar
Construction of ground floor rcc frame structure of piyoli phukon stadium complex, part-v, sivasagar
Read moreof your Industry type