Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Ahp Attending Breakdown Maintenance Works In Unit I Ii Iii Heat Exchanger Discharge Pipe Line Tunnel Pipe Line From Transformer Yard To Stage I Ii Ash Water Sump And High Pressure Pipe Line Fittings For The Period From 01 04 2025 To
|
Description |
Ttps Mech Ii Ahp Attending Breakdown Maintenance Works In Unit I Ii Iii Heat Exchanger Discharge Pipe Line Tunnel Pipe Line From Transformer Yard To Stage I Ii Ash Water Sump And High Pressure Pipe Line Fittings For The Period From 01 04 2025 To
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527733_1 |
Reference Number |
CE/TTPS/SE/M-II/No.53/2025-26 |
Tender Fee | 0 |
EMD | 6300 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628417 |
Start Date | February 25, 2025 23:30 |
End Date |
12/03/2025 ( Expired 60 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii ahp reconditioning the wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper
Ttps mech ii ahp reconditioning the wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper
Read moreSupply of 200nb ss316 gr spool piece for sea water jetting line from high pressure water pump to ash slurry sump of stage ii
Supply of 200nb ss316 gr spool piece for sea water jetting line from high pressure water pump to ash slurry sump of stage ii
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreTtps mech ii ahp stage i ii awph overhauling and load testing of 7 5 ton capacity eot cranes in ash water pump house
Ttps mech ii ahp stage i ii awph overhauling and load testing of 7 5 ton capacity eot cranes in ash water pump house
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii
Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii
Read moreTtps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Read moreof your Industry type