Title
Ttps Mech Ii Ahp Attending Breakdown Maintenance Works In Unit I Ii Iii Heat Exchanger Discharge Pipe Line Tunnel Pipe Line From Transformer Yard To Stage I Ii Ash Water Sump And High Pressure Pipe Line Fittings For The Period From 01 04 2025 To
Description
Ttps Mech Ii Ahp Attending Breakdown Maintenance Works In Unit I Ii Iii Heat Exchanger Discharge Pipe Line Tunnel Pipe Line From Transformer Yard To Stage I Ii Ash Water Sump And High Pressure Pipe Line Fittings For The Period From 01 04 2025 To
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_527733_1
Reference
Number
CE/TTPS/SE/M-II/No.53/2025-26
Tender Fee 0
EMD 6300
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628417
Start Date February 25, 2025 23:30
End Date

12/03/2025 ( Expired 60 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps mech ii ahp reconditioning the wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper

Ttps mech ii ahp reconditioning the wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper

Read more
Supply of 200nb ss316 gr spool piece for sea water jetting line from high pressure water pump to ash slurry sump of stage ii

Supply of 200nb ss316 gr spool piece for sea water jetting line from high pressure water pump to ash slurry sump of stage ii

Read more
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Ttps mech ii ahp stage i ii awph overhauling and load testing of 7 5 ton capacity eot cranes in ash water pump house

Ttps mech ii ahp stage i ii awph overhauling and load testing of 7 5 ton capacity eot cranes in ash water pump house

Read more
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site

Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site

Read more
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Read more
Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii

Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii

Read more
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Read more
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026

Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise