Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
F.O.R . Supply Of I.D. Fan For Boiler No. 3 (30 Tph) Capacity From Manufacturers
|
| Description |
F.O.R . Supply Of I.D. Fan For Boiler No. 3 (30 Tph) Capacity From Manufacturers
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_KSCML_814893_1 |
|
Reference Number |
338/c/PS/Tender/01/20232-24 |
| Tender Fee | 590 |
| EMD | 10000 |
| Tender Value | - |
| Place | Hasanpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | June 23, 2023 23:30 |
| End Date |
Expired
30/06/2023
Expired 1205 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cane cutter,fibrizer,boiler fd fan,boiler id fan,bagasilo blower,nk 1301 continuous machine,nk 1100 continuous machine,boiler no 3 spreyder
Cane cutter,fibrizer,boiler fd fan,boiler id fan,bagasilo blower,nk 1301 continuous machine,nk 1100 continuous machine,boiler no 3 spreyder
Read moreSupply of potato peeler of capacity 15 kg to smvdsb, f.o.r. engineering store, banganga, katra.
Supply of potato peeler of capacity 15 kg to smvdsb, f.o.r. engineering store, banganga, katra.
Read moreOil fired interconnected boiler of capacity 4000 kg/hr and 2000 kg/hr confirming to ibr norms.
Oil fired interconnected boiler of capacity 4000 kg/hr and 2000 kg/hr confirming to ibr norms.
Read moreDynamically balancing work at site of boiler i d fan,dynamically balancing work at site of boiler f d fan,dynamically balancing work at site of boiler s a fan,dynamically balancing work at site of baggase blower fan,dynamically balancing work at site of fibrizer,dynamically balancing work at site of leveller,dynamically balancing work at site of continuous cfg machine b 1500,dynamically balancing work at site of continuous cfg machine c after 1350,dynamically balancing work at site of continuous cfg machine c 1350,dynamically balancing work at site power turbine with alternator,thickness testing of molassses tank
Dynamically balancing work at site of boiler i d fan,dynamically balancing work at site of boiler f d fan,dynamically balancing work at site of boiler s a fan,dynamically balancing work at site of baggase blower fan,dynamically balancing work at site of fibrizer,dynamically balancing work at site of leveller,dynamically balancing work at site of continuous cfg machine b 1500,dynamically balancing work at site of continuous cfg machine c after 1350,dynamically balancing work at site of continuous cfg machine c 1350,dynamically balancing work at site power turbine with alternator,thickness testing of molassses tank
Read moreProcurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Procurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Read moreName of the work :- (i) provision of 06 nos 10 kva capacity auxiliary transformer for interlocking of 3 nos. of non-interlocked lc gates (ka-48, rc-2 & mr-35) where tvu is greater than 10000 over adra division )proj id : 12.01.29.25.3.50.006). (ii) provision of 03 nos 10 kva capacity auxiliary transformer for interlocking of lc gate rc-5 and dk-2 in the section of sse/signal/ada in ada division (proj. i.d.-12.01.29.26.3.50.002) (iii) provision of 04 nos 10 kva capacity auxiliary transf
Name of the work :- (i) provision of 06 nos 10 kva capacity auxiliary transformer for interlocking of 3 nos. of non-interlocked lc gates (ka-48, rc-2 & mr-35) where tvu is greater than 10000 over adra division )proj id : 12.01.29.25.3.50.006). (ii) provision of 03 nos 10 kva capacity auxiliary transformer for interlocking of lc gate rc-5 and dk-2 in the section of sse/signal/ada in ada division (proj. i.d.-12.01.29.26.3.50.002) (iii) provision of 04 nos 10 kva capacity auxiliary transf
Read more757/p-3/emp-13345 dt. 25.09.2026 for overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Read moreWork contract of routine maintenance of boiler firing and coal feed system, complete fan group along with lop system, hp lp dozing system and fuel pressuring hfo and ldo pumps system of unit no. 1 to 4 of ph i and ph ii at sgtps, mppgcl, birsinghpur
Work contract of routine maintenance of boiler firing and coal feed system, complete fan group along with lop system, hp lp dozing system and fuel pressuring hfo and ldo pumps system of unit no. 1 to 4 of ph i and ph ii at sgtps, mppgcl, birsinghpur
Read moreWater boiler of 30 ltrs 3 kw capacity for hot buffet lhb type coaches generally conforming to is: 3412 along with control box & necessary plumbing & tap arrangement on a common base plate conforming to rcf specification no. edts-118, rev.-e & drg. no. lh 72221.
Water boiler of 30 ltrs 3 kw capacity for hot buffet lhb type coaches generally conforming to is: 3412 along with control box & necessary plumbing & tap arrangement on a common base plate conforming to rcf specification no. edts-118, rev.-e & drg. no. lh 72221.
Read moreDesign, manufacture, supply, installation, testing, and commissioning of a 14-passenger capacity lift (952 kg) for the foot over bridge (fob) inside the station building. all structures, components, dimensions, testing protocols, inspections, and compliance conditions must strictly adhere to specification no. rdso/2013/em/spec/0016 (rev 2)-2025 dated 25.09.2025 (or the latest amendment). approved makes: only equipment from the following approved manufacturers will be accepted: johnson, schindl
Design, manufacture, supply, installation, testing, and commissioning of a 14-passenger capacity lift (952 kg) for the foot over bridge (fob) inside the station building. all structures, components, dimensions, testing protocols, inspections, and compliance conditions must strictly adhere to specification no. rdso/2013/em/spec/0016 (rev 2)-2025 dated 25.09.2025 (or the latest amendment). approved makes: only equipment from the following approved manufacturers will be accepted: johnson, schindl
Read moreof your Industry type