| Particulars | Details |
|---|---|
| Title |
Repairing/Maintenance Of Earth Pits Connection Of Lightning Arrester And Weigh Bridge Equipment Of Weigh Bridge Installed At Peocp, Hazaribagh Area.
|
| Description |
Repairing/Maintenance Of Earth Pits Connection Of Lightning Arrester And Weigh Bridge Equipment Of Weigh Bridge Installed At Peocp, Hazaribagh Area
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_334527_1 |
|
Reference Number |
PO/PEOCP/EnM/Tender/25-26/03 |
| Tender Fee | 0 |
| EMD | 3100 |
| Tender Value | - |
| Place | PEOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346781 |
| Start Date | April 24, 2025 20:30 |
| End Date |
Expired
05/05/2025
Expired 530 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing earth pits lightning conductors at cw vijayawada ii
Providing earth pits lightning conductors at cw vijayawada ii
Read moreProviding of 17 nos. new individual dedicated earth pits for each phase of lightning arrestors (las),duly connecting to existing switchyard earth mat of various feeder bays at 220/132/33 kv ss, mahabubnagar (bhoothpur).
Providing of 17 nos. new individual dedicated earth pits for each phase of lightning arrestors (las),duly connecting to existing switchyard earth mat of various feeder bays at 220/132/33 kv ss, mahabubnagar (bhoothpur).
Read moreS&t work related with (1). ancillary works for weigh bridges at bnf, kth & bhkd. (2). provision of 02 new electronic in motion weigh bridge (eimwb) at padh, snmy. (3). padma-auxiliary work in connection with provision weigh bridge(wb) at padma due to shifting of wb from kkas to padma.
S&t work related with (1). ancillary works for weigh bridges at bnf, kth & bhkd. (2). provision of 02 new electronic in motion weigh bridge (eimwb) at padh, snmy. (3). padma-auxiliary work in connection with provision weigh bridge(wb) at padma due to shifting of wb from kkas to padma.
Read moreCleaning, testing and adjusting of ci test weight each of 20 kg for annual verification and stamping of newly installed 140 mt rail in-motion weigh bridge installed at saunda siding under urimari project
Cleaning, testing and adjusting of ci test weight each of 20 kg for annual verification and stamping of newly installed 140 mt rail in-motion weigh bridge installed at saunda siding under urimari project
Read moreSupply and installation of 42 kv lightning arrester (la) with accessories in system-i and modification of la installed in system-ii at various power supply installation (psi) in 2x25 kv ohe unit under cgm/ddu.
Supply and installation of 42 kv lightning arrester (la) with accessories in system-i and modification of la installed in system-ii at various power supply installation (psi) in 2x25 kv ohe unit under cgm/ddu.
Read moreEarthing system materials,heavy duty conventional lightning arrester,down conductor,16 sq mm multi strand single core pvc insulated copper cable,35 sq mm multi strand single core pvc insulated copper cable,combined type 1 plus 2 spd,ethernet surge protector,online earth resistance monitoring system,lightning strike counter,installation integration testing commissioning and documentation of all earthing lps and surge protection in grid or mesh
Earthing system materials,heavy duty conventional lightning arrester,down conductor,16 sq mm multi strand single core pvc insulated copper cable,35 sq mm multi strand single core pvc insulated copper cable,combined type 1 plus 2 spd,ethernet surge protector,online earth resistance monitoring system,lightning strike counter,installation integration testing commissioning and documentation of all earthing lps and surge protection in grid or mesh
Read moreAhmedabad division- provision for annual maintenance contract of diesel generators installed in various stations at ahmedabad division for the period of three years after completion of current contract, electrical work in connection with installation and commissioning of pitless electronic in motion weigh bridge at kankariya yard and provision of proto-deployment development of mvis on ahmedabad division.
Ahmedabad division- provision for annual maintenance contract of diesel generators installed in various stations at ahmedabad division for the period of three years after completion of current contract, electrical work in connection with installation and commissioning of pitless electronic in motion weigh bridge at kankariya yard and provision of proto-deployment development of mvis on ahmedabad division.
Read moreS&t work in connection with (i) installation of an electronic in-motion weigh-bridge (eimwb) at bksc loco line in adra division; (ii) utility shifting and renovation work for fob, pf, circulating area, pipeline, etc., at bankura station yard in adra division.
S&t work in connection with (i) installation of an electronic in-motion weigh-bridge (eimwb) at bksc loco line in adra division; (ii) utility shifting and renovation work for fob, pf, circulating area, pipeline, etc., at bankura station yard in adra division.
Read moreConstant temperature water bath,is sieve mechanical sieve shaker,coarse aggregate sieve,coarse aggregate sieve set,ph meter,bod bottles,burette,pipette,jar bottle,reagent bottle 100 ml,wash bottle 500 ml,piezoelectric transducer,lvdt,stroboscope tachometer,photoelectric tachometer,servomotor,stepper motor,oil hydraulic trainer kit,pneumatic trainer kit,lever operated directional control valve,rope brake dynamometer,pony brake dynamometer model,idmt over current relay testing kit,electro mechanical type earth fault relay testing kit,transmission line training system,symmetrical and unsymmetrical fault demonstrator trainer,kelvins double bridge trainer kit,maxwels bridge trainer kit,lvdt trainer kit,strain gauge trainer kit,rtd trainer kit,measurment of power and power factor in rlc series circuit,measurement of power and power factor in rlc circuit parallel,trainer star delta connection,molding box,molding box,hand riddle,shovel,rammers,sprue pin,mallet 4lbs,strike off bar,bellow,crucible 1l,crucible 2l,crucib
Constant temperature water bath,is sieve mechanical sieve shaker,coarse aggregate sieve,coarse aggregate sieve set,ph meter,bod bottles,burette,pipette,jar bottle,reagent bottle 100 ml,wash bottle 500 ml,piezoelectric transducer,lvdt,stroboscope tachometer,photoelectric tachometer,servomotor,stepper motor,oil hydraulic trainer kit,pneumatic trainer kit,lever operated directional control valve,rope brake dynamometer,pony brake dynamometer model,idmt over current relay testing kit,electro mechanical type earth fault relay testing kit,transmission line training system,symmetrical and unsymmetrical fault demonstrator trainer,kelvins double bridge trainer kit,maxwels bridge trainer kit,lvdt trainer kit,strain gauge trainer kit,rtd trainer kit,measurment of power and power factor in rlc series circuit,measurement of power and power factor in rlc circuit parallel,trainer star delta connection,molding box,molding box,hand riddle,shovel,rammers,sprue pin,mallet 4lbs,strike off bar,bellow,crucible 1l,crucible 2l,crucib
Read moreRepairing/maintenance of earth pits connection of lightning arrester and weigh bridge equipment of three nos. weigh bridge installed at tapin north ocp , hazaribagh area
Repairing/maintenance of earth pits connection of lightning arrester and weigh bridge equipment of three nos. weigh bridge installed at tapin north ocp , hazaribagh area
Read moreof your Industry type