Title
Shifting Of Overhead Lines From Airport To Kathaula Mod, Prayagraj Under Mahakumbh Mela 2024 25
Description
Refer To Tender Description
Organisation Government of Uttar Pradesh
Tender Id 2023_PVVNV_815518_1
Reference
Number
29/TMKM/EC/2023-24
Tender Fee 11800
EMD 7.04 Lakh
Tender Value -
Place Prayagraj
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date June 27, 2023 00:25
End Date
Expired 03/07/2023

Expired 1196 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Read more
Proposal for shifting and re-routing of existing 33kv kailashnagar and mavala double circuit feeder towards punjab chowk from diamond function hala(thirupally) due to dismantling of the existing 33kv feeder line corridor between diamond function hall(thirupaly) and khanapur substation road for airport/air force development purposes in operation adilabad town-3 adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Proposal for shifting and re-routing of existing 33kv kailashnagar and mavala double circuit feeder towards punjab chowk from diamond function hala(thirupally) due to dismantling of the existing 33kv feeder line corridor between diamond function hall(thirupaly) and khanapur substation road for airport/air force development purposes in operation adilabad town-3 adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Read more
Shifting and re-routing of existing 33kv kailashnagar and mavala double circuit feeder towards collector chowk from punjab chowk due to dismantling of the existing 33kv feeder line corridor between diamond function hall(thirupaly) and khanapur substation road for airport/air force development purposes in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Shifting and re-routing of existing 33kv kailashnagar and mavala double circuit feeder towards collector chowk from punjab chowk due to dismantling of the existing 33kv feeder line corridor between diamond function hall(thirupaly) and khanapur substation road for airport/air force development purposes in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Read more
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Read more
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining

Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining to lines osmania section of lines asifnagar sub division in mehdipatnam operation division and work executed by the master plan sd-vi sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works.

Read more
Miscellaneous civil work for preparation of mahakumbh 2025 at prayagraj airport.

Miscellaneous civil work for preparation of mahakumbh 2025 at prayagraj airport.