Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Opening And Boxing Up Of End Cup With Replacement Of Gaskets After Taking Out And Placing Back The Tube Bundle Of Re Boiler (E 5208) And Its Safety Valves Testing Of Fact, Petro Uc
|
| Description |
Opening And Boxing Up Of End Cup With Replacement Of Gaskets After Taking Out And Placing Back The Tube Bundle Of Re Boiler (E 5208) And Its Safety Valves Testing Of Fact, Petro Uc
|
| Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
| Tender Id | 2025_FACT_867186_1 |
|
Reference Number |
5061/2025-2026/E31737 |
| Tender Fee | 0 |
| EMD | 2000 |
| Tender Value | |
| Place | Udyogamandal |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=911622 |
| Start Date | July 03, 2025 19:30 |
| End Date |
Expired
18/07/2025
Expired 351 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Opening, boxing-up and gasket replacements of heat exchanger end cups in anone plant of fact petro-uc.
Opening, boxing-up and gasket replacements of heat exchanger end cups in anone plant of fact petro-uc.
Read moreOpening, boxing-up and gasket replacement of heat exchanger end cups in anone plant of fact petro uc
Opening, boxing-up and gasket replacement of heat exchanger end cups in anone plant of fact petro uc
Read moreOpening and boxing up heat exchangers end cups in hyam plant, petro plants uc
Opening and boxing up heat exchangers end cups in hyam plant, petro plants uc
Read moreOpening and boxing-up of both end cups with replacement of gaskets of re-boiler e5806 and replacement of damaged impingement plate etc. in petro plants.
Opening and boxing-up of both end cups with replacement of gaskets of re-boiler e5806 and replacement of damaged impingement plate etc. in petro plants.
Read moreOpening and boxing-up of both end cups with replacement of gaskets of re-boiler e5702, e5704 and e5812. unbolting, re-bolting, replacing of gaskets, leak arresting of flange joints, dummies, manholes etc. in petro plants.
Opening and boxing-up of both end cups with replacement of gaskets of re-boiler e5702, e5704 and e5812. unbolting, re-bolting, replacing of gaskets, leak arresting of flange joints, dummies, manholes etc. in petro plants.
Read moreOpening, boxing-up and gasket replacement of heat exchanger end cups and other mechanical works in lactam plant, petro uc.
Opening, boxing-up and gasket replacement of heat exchanger end cups and other mechanical works in lactam plant, petro uc.
Read moreOpening, boxing-up and gasket replacement of flanges and other mechanical works in waste water treatment plant, petro uc
Opening, boxing-up and gasket replacement of flanges and other mechanical works in waste water treatment plant, petro uc
Read moreDismantling, testing and re-fixing of safety relief valves at top of the lpg bullets and hydrogen bullets in main tank farm area of fact, petro plants uc.
Dismantling, testing and re-fixing of safety relief valves at top of the lpg bullets and hydrogen bullets in main tank farm area of fact, petro plants uc.
Read moreOpening and boxing up heat exchangers end cups and other miscellaneous activities during short shutdown and ata-2024 in hyam and utilites area, petro plants, uc.
Opening and boxing up heat exchangers end cups and other miscellaneous activities during short shutdown and ata-2024 in hyam and utilites area, petro plants, uc.
Read moreDismantling, testing and re-fixing of safety relief valves at top of the lpg bullets and hydrogen bullets in main tank farm and ammonia handling areas of fact, petro plants uc.
Dismantling, testing and re-fixing of safety relief valves at top of the lpg bullets and hydrogen bullets in main tank farm and ammonia handling areas of fact, petro plants uc.
Read moreof your Industry type