Tender Details
Particulars | Details |
---|---|
Title |
Impt Nitane To Kundar Vasti Km 0/00 To 2/00 Vr 327 Tal Baglan
|
Description |
Impt Nitane To Kundar Vasti Km 0/00 To 2/00 Vr 327 Tal Baglan
|
Organisation | RDD-CEO-NASHIK | State Govt. and UT |
Tender Id | 2024_NASHI_1078160_1 |
Reference Number |
bnc2 ps 2024-25 tn03wono08 |
Tender Fee | 1680 |
EMD | 40000 |
Tender Value | |
Place | baglan |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1881538 |
Start Date | August 31, 2024 20:30 |
End Date |
09/09/2024 ( Expired 252 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreDnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Dnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreof your Industry type