Tender Details

Particulars Details
Title
Replacing Of Existing False Flooring System At Main Control Room Cogen Control Room Kti Control Room Gas Terminal Control Room Ther Boiler Room And Fax Room Of Satellite Building In Ongc Hazira Plant Surat
Description
Replacing Of Existing False Flooring System At Main Control Room Cogen Control Room Kti Control Room Gas Terminal Control Room Ther Boiler Room And Fax Room Of Satellite Building In Ongc Hazira Plant Surat
Organisation Oil and Natural Gas Corporation Limited | Public Sector Undertakings
Tender Id 2024_ONGC_212265_1
Reference
Number
8C52C24009
Tender Fee 0
EMD 4.35 Lakh
Tender Value
Place ONGC HAZIRA PLANT
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=233420
Start Date October 26, 2024 14:30
End Date

25/11/2024 ( Expired 217 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Expansion of existing fire and gas detection system at process plant, dahej plant ongc

Expansion of existing fire and gas detection system at process plant, dahej plant ongc

Read more
Selection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur

Selection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur

Read more
Underground scanning and survey at fact udyogamandal complex for locate existing under ground utilities of proposed locations of new ammonia handling control room, air drying tower and ud store.

Underground scanning and survey at fact udyogamandal complex for locate existing under ground utilities of proposed locations of new ammonia handling control room, air drying tower and ud store.

Read more
Providing water supply, sewerage and storm sewer network, main pumping station, effluent treatment plant, fire fighting system and rain water harvesting system in e-bus charging station near mathura colony at patiala.

Providing water supply, sewerage and storm sewer network, main pumping station, effluent treatment plant, fire fighting system and rain water harvesting system in e-bus charging station near mathura colony at patiala.

Read more
Work of providing and fixing of air pollution control system and necessary allied works at vaikunthdham hindu cemetery, reay road in e ward.

Work of providing and fixing of air pollution control system and necessary allied works at vaikunthdham hindu cemetery, reay road in e ward.

Read more
Addn altn railing near vatika, flooring in bar room (bldg no o-12), provn of paved hard standing near ec offrs mess and klp loc ecib, vertical ac at comd museum bldg od-13, att toilet and washroom in main office of bapu under ge (fw) kolkata

Addn altn railing near vatika, flooring in bar room (bldg no o-12), provn of paved hard standing near ec offrs mess and klp loc ecib, vertical ac at comd museum bldg od-13, att toilet and washroom in main office of bapu under ge (fw) kolkata

Read more
Replacing of damaged old false ceiling with new false ceiling along with necessary electrical works in new chemical and biotechnology department building conference hall (5th floor) at nit warangal.

Replacing of damaged old false ceiling with new false ceiling along with necessary electrical works in new chemical and biotechnology department building conference hall (5th floor) at nit warangal.

Read more
Installation of two nos of screw chillers in ac system in place of existing vam units 3 and 4 at apcpl.

Installation of two nos of screw chillers in ac system in place of existing vam units 3 and 4 at apcpl.

Read more
Provision of 07 nos split acs for mi room at icgs vizhinjam provision of water fountain in front of admin building and cg officers mes at icgs vizhinjam and provision of rcc hard standing at cg wharf land vizhinjam harbour

Provision of 07 nos split acs for mi room at icgs vizhinjam provision of water fountain in front of admin building and cg officers mes at icgs vizhinjam and provision of rcc hard standing at cg wharf land vizhinjam harbour

Read more
Retrofitting of ge make existing air circuit breakers acbs installed in various pmccs of c2c3 and utility substation of ongc uran plant and supply of spare acbs

Retrofitting of ge make existing air circuit breakers&#x0d acbs installed in various pmccs of c2c3 and utility&#x0d substation of ongc uran plant and supply of spare&#x0d acbs

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise