Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacing Of Existing False Flooring System At Main Control Room Cogen Control Room Kti Control Room Gas Terminal Control Room Ther Boiler Room And Fax Room Of Satellite Building In Ongc Hazira Plant Surat
|
| Description |
Replacing Of Existing False Flooring System At Main Control Room Cogen Control Room Kti Control Room Gas Terminal Control Room Ther Boiler Room And Fax Room Of Satellite Building In Ongc Hazira Plant Surat
|
| Organisation | Oil and Natural Gas Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_ONGC_212265_1 |
|
Reference Number |
8C52C24009 |
| Tender Fee | 0 |
| EMD | 4.35 Lakh |
| Tender Value | - |
| Place | ONGC HAZIRA PLANT |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=233420 |
| Start Date | October 26, 2024 14:30 |
| End Date |
Expired
25/11/2024
Expired 645 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Revamping of central ac plant of satellite building and sitc of new central ac plant at gis building, cogen hazira plant
Revamping of central ac plant of satellite building and sitc of new central ac plant at gis building, cogen hazira plant on lstk basis along with 5 years post warranty camc
Read moreCivil repair and renovation works at qpcl building electric work shop main control room building and adm building of ongc hazira plant surat
Civil repair and renovation works at qpcl building, electric work shop, main control room building and adm building of ongc hazira plant surat
Read moreUpgradation of existing centralized metering scada system installed at hazira control room
Read more
Replacing the damaged sun control film with new one in switchyard control room building and main control room building and replacing the damaged pvc vinyl flooring sheets in main control room building
Replacing the damaged sun control film with new one in switchyard control room building and main control room building and replacing the damaged pvc vinyl flooring sheets in main control room building at vgtps/ramanathapuram
Read moreClean agent system for control room and satellite rack room for nrl at paradip
Design,engineering,supply,installation,testing and commissioning of clean agent system for control room and satellite rack room in connection with crude oil import terminal (coit) project for nrl at paradip
Read moreAmc for hvac system installed at control room and split acs installed at switch gear room of hazira compressor station.
Amc for hvac system installed at control room and split acs installed at switch gear room of hazira compressor station.
Read moreReplacing the p.v.c. sheet flooring of f.m. studio room, and control room at akashvani, agartala (tripura).
Replacing the p.v.c. sheet flooring of f.m. studio room, and control room at akashvani, agartala (tripura).
Read moreTable 8x4,table 6x3,table 6x3.5,u shape table,control room table 6x3.5,fax table 5x3,reception tabl
Read more
Table 8x4,table 6x3,table 6x3.5,u shape table,control room table 6x3.5,fax table 5x3,reception tabl
Read more
General-government secretariat, thiruvananthapuram- replacing mccb in the main electrical control room -msb2-general electrical work
General-government secretariat, thiruvananthapuram- replacing mccb in the main electrical control room -msb2-general electrical work
Read moreof your Industry type