Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Protection Wall At The Earth Slipped Area At 14th Hair Pin Bend Along The Road Leading From Kadamparai Arch To Kadamparai Power House And 3rd Bend From Anna Statue To Punachi Power House At Upper Aliyar Dam
|
| Description |
Construction Of Rcc Protection Wall At The Earth Slipped Area At 14th Hair Pin Bend Along The Road Leading From Kadamparai Arch To Kadamparai Power House And 3rd Bend From Anna Statue To Punachi Power House At Upper Aliyar Dam
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_607410_1 |
|
Reference Number |
SECHPERDKADGENCIR01202526 |
| Tender Fee | 0 |
| EMD | 29700 |
| Tender Value | |
| Place | KADAMPARAI |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=725966 |
| Start Date | September 22, 2025 22:30 |
| End Date |
Expired
07/10/2025
Expired 240 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
- construction of rcc protection wall at the earth slipped area at chainage 100 m from y junction along the road leading from kadamparai dam y junction to vandal dam at kadamparai power house
- construction of rcc protection wall at the earth slipped area at chainage 100 m from y junction along the road leading from kadamparai dam y junction to vandal dam at kadamparai power house
Read moreConstruction of rcc protection wall at the earth slipped area at 6th bend and providing support to the rock to avoid slippage along the road at 8th bend leading from dam left flank to dam right flank at upper aliyar dam
Construction of rcc protection wall at the earth slipped area at 6th bend and providing support to the rock to avoid slippage along the road at 8th bend leading from dam left flank to dam right flank at upper aliyar dam
Read moreClearing the heavy jungle from upper aliyar dam to kadamparai dam
Clearing the heavy jungle from upper aliyar dam to kadamparai dam
Read moreConstruction of rcc protection wall at the earth slipped area inch 8.00km to ch 8.30 km near kundrapettai stream in right hand side and ch 8.00km to ch 8.15 km in left hand side of the road leading from kadamparai arch to kadamparai power house
Construction of rcc protection wall at the earth slipped area inch 8.00km to ch 8.30 km near kundrapettai stream in right hand side and ch 8.00km to ch 8.15 km in left hand side of the road leading from kadamparai arch to kadamparai power house
Read moreOutsourcing gauge readers for observing kadamparai dam level and to communicate the levels to the control room of kadamparai underground power house for a period of 12 months from the date of utilization for the year 2024 to 25 in kadamparai gen circ
Outsourcing gauge readers for observing kadamparai dam level and to communicate the levels to the control room of kadamparai underground power house for a period of 12 months from the date of utilization for the year 2024 to 25 in kadamparai gen circ
Read moreProtection and stabilization work along the road in dam area from rd 5253 to rd 5315 and repair of rcc retaining outlet channel wall of sft at dul dam dps- kishtwar
Protection and stabilization work along the road in dam area from rd 5253 to rd 5315 and repair of rcc retaining outlet channel wall of sft at dul dam dps- kishtwar
Read moreConstruction of protection wall in a new alignment to replace the existing damaged protection wall to avoid erosion in the tailrace of tunnel power house at mettur dam in erode generation circle.
Construction of protection wall in a new alignment to replace the existing damaged protection wall to avoid erosion in the tailrace of tunnel power house at mettur dam in erode generation circle.
Read moreEmergent protection wall at the road from sawji khola to upper singbongdera,mazuwa g.p. darjeeling
Emergent protection wall at the road from sawji khola to upper singbongdera,mazuwa g.p. darjeeling
Read moreUpper kallr shep (2x1 mw/5.41 mu) - laying / fixing of coir geotextiles as soil protection work at upper kallar power house site along the right side of penstock route
Upper kallr shep (2x1 mw/5.41 mu) - laying / fixing of coir geotextiles as soil protection work at upper kallar power house site along the right side of penstock route
Read moreAnnual maintenance of road from filter house circle to ppv dam road arch at tirumala for the year 2025 26
Annual maintenance of road from filter house circle to ppv dam road arch at tirumala for the year 2025 26
Read moreof your Industry type