Tender Details

Particulars Details
Title
40 Improvement Works To Thuruthy Punnayam Road
Description
40 Improvement Works To Thuruthy Punnayam Road
Organisation Government of Kerala
Tender Id 2023_LSGD_605322_33
Reference
Number
01/AE/MDK/2023-2024
Tender Fee 1095
EMD 12369
Tender Value -
Place ASSIST ENGINEER OFFICE MUDAKUZHA
Link
View Original Tender Notice

https://etenders.kerala.gov.in

Start Date December 23, 2023 19:00
End Date
Expired 04/01/2024

Expired 1002 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities

Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
152drain maintenance in thuruthy punnayam road- ward 6

152drain maintenance in thuruthy punnayam road

Read more
Drain maintenance in thuruthy punnayam road- ward 6

Drain maintenance in thuruthy punnayam road- ward 6 mudakkuzha

Read more
152drain maintenance in thuruthy punnayam road- ward 6

152drain maintenance in thuruthy punnayam road- ward 6

Read more
42improvement works to thuruthy lakshamveed colony road ward 7

42improvement works to thuruthy lakshamveed colony road

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise