Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
U Bolt For Rear Leaf Spring For Bp Sml
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2023/B/3951164 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 18, 2023 17:57 |
| End Date |
Expired
09/10/2023
Expired 1060 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Providing and fixing of protection cover and maintenance platform for various components at bp dam and tattihalla dam.
Providing and fixing of protection cover and maintenance platform for various components at bp dam and tattihalla dam- scope of work as per tender document.
Read moreSupply of office stationaries and computer stationaries for the year 2026-27 to k. u. dharwad.
Supply of office stationaries and computer stationaries for the year 2026-27 to k. u. dharwad.
Read moreRepair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Repair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Read moreSupply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5.
Supply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5- scope of work as per tender document.
Read moreRoutine/breakdown/preventive and emergency maintenance works of 6.6kv ht switchgear and ht motors and 11kv colony and other outline switchgears and accessories of u-5 to 8 for a period of one year at rtps
Routine/breakdown/preventive and emergency maintenance works of 6.6kv ht switchgear and ht motors and 11kv colony and other outline switchgears and accessories of u-5 to 8 for a period of one year at rtps
Read moreResurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of koyyoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 13.80 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of koyyoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 13.80 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of dodderi block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 11.30 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of dodderi block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 11.30 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreof your Industry type