Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Application Of Surface Protective Coating On Spiral Casing, Stay Rings, Stay Vanes Of Generating Unit 3 Of Chamera Iii Power Station ( E Office No. 148320)
|
| Description |
Application Of Surface Protective Coating On Spiral Casing, Stay Rings, Stay Vanes Of Generating Unit 3 Of Chamera Iii Power Station ( E Office No. 148320)
|
| Organisation | NHPC Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_NHPC_874045_1 |
|
Reference Number |
NH/CPS- III/Cont./148320/2025-26/156 |
| Tender Fee | 1180 |
| EMD | 1.5 Lakh |
| Tender Value | - |
| Place | Chamera-III PS |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=918801 |
| Start Date | August 21, 2025 21:30 |
| End Date |
Expired
13/09/2025
Expired 397 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Application of surface protective coating (ceramic coating) on spiral casing, stay vanes, stay ring and miv outlet pipe along with ceramic beads filled wear protection coating on stay ring and stay vanes of two generating units of parbati-iii ps
Application of surface protective coating (ceramic coating) on spiral casing, stay vanes, stay ring and miv outlet pipe along with ceramic beads filled wear protection coating on stay ring and stay vanes of two generating units of parbati-iii p s
Read moreSupply and application of surface protective coating on inlet pipe of spiral casing, part of penstock and lower dt cone of generating units of tanakpur power station
Supply and application of surface protective coating on inlet pipe of spiral casing, part of penstock and lower dt cone of generating units of tanakpur power station
Read moreSupply and application of wear and protective coating on underwater parts
Supply and application of wear and protective coating on underwater parts of unit 2 and 3.
Read moreEmpty barrels of 210 lts capacity, grade a confirming to is 1783 (part 1): 1993 latest, triple/spiral seam construction for type 2 drums, type 2d, drums with strengthening corrugations on the body, minimum gross capacity 210 liters , nominal thickness of steel sheets- 1.25 mm, two screwed closures one of 50 mm and the other of 20 mm, body of drum shall be continuously resistant welded so as to provide air tight joint, internal protective coating & outer stove enamelled paint, internal phosphat
Empty barrels of 210 lts capacity, grade a confirming to is 1783 (part 1): 1993 latest, triple/spiral seam construction for type 2 drums, type 2d, drums with strengthening corrugations on the body, minimum gross capacity 210 liters , nominal thickness of steel sheets- 1.25 mm, two screwed closures one of 50 mm and the other of 20 mm, body of drum shall be continuously resistant welded so as to provide air tight joint, internal protective coating & outer stove enamelled paint, internal phosphat
Read moreApplication of surface protective coating on spiral casing, stay rings, stay vanes, inner portion
Application of surface protective coating on spiral casing, stay rings, stay vanes, inner portion 
 of top cover, bottom ring and throat ring of two generating units of chamera -iii power station
 (pkg. no. ph-04)
Read moreApplication of protective coating on spiral casing, stay ring and stay vanes of turbine, chamera- iii power station, dharwala (pkg. no. ph-03)
Application of protective coating on spiral casing, stay ring and stay vanes of turbine, chamera- iii power station, dharwala (pkg. no. ph-03)
Read moreApplication of surface protective coating on spiral casing, stay rings, stay vanes and designated areas of bottom discharge ring and top cover of generating unit# 1 of chamera-ii power station during capital maintenance of 2024-25. (pkg. no. phii-995
Application of surface protective coating on spiral casing, stay rings, stay vanes and designated areas of bottom discharge ring and top cover of generating unit# 1 of chamera-ii power station during capital maintenance of 2024-25. (pkg. no. phii-995
Read moreApplication of surface protective coating on spiral casing, stay rings, stay vanes and designated areas of bottom discharge ring and top cover of generating unit 3 of chamera-ii power station during capital maintenance of 2023-24. (pkg. no. phii-985
Application of surface protective coating on spiral casing, stay rings, stay vanes and designated areas of bottom discharge ring and top cover of generating unit 3 of chamera-ii power station during capital maintenance of 2023-24. (pkg. no. phii-985
Read moreProtective ceramic coating of spiral casing and stay ring along with stay vanes of generating unit 4 of dhauliganga power station.
Protective ceramic coating of spiral casing and stay ring along with stay vanes of generating unit 4 of dhauliganga power station.
Read moreProtective ceramic coating on spiral casing, stay vanes and turbine top cover of generating units of teesta-v power station
Protective ceramic coating on spiral casing, stay vanes and turbine top cover of generating units of teesta-v power station
Read moreof your Industry type