Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design Manufacture Supply Installation Testing,Commissioning And Integration Of Back Office For Automatic Fare Collection (Afc) System For Cmrl Phase Ii Corridor 4
|
| Description |
Design,Manufacture,Supply,Installation,Testing,Commissioning And Integration Of Back Office For Automatic Fare Collection (Afc) System For Cmrl Phase Ii Corridor 4
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_CMMDB_741406_1 |
|
Reference Number |
CMRL/PHASE2/SYS/C4_AFA03a/2023 |
| Tender Fee | 32000 |
| EMD | 62 Lakh |
| Tender Value | - |
| Place | Chennai Metro Rail Limited,METROS |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 05, 2023 23:30 |
| End Date |
Expired
24/07/2023
Expired 1138 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design manufacture supply installation testing commissioning and maintenance of station level equipment for automatic fare collection (afc) system for cmrl phase ii _corridor4.
Design,manufacture,supply,installation,testing,commissioning and maintenance of station level equipment for automatic fare collection (afc) system for cmrl phase ii _corridor 4.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment for automatic fare collection (afc)system for cmrl phaseii corridor3 (sholinganallur to sipcot)and corridor 5(koyambedu to elcot park)
Design manufacture supply installation testing commissioning training and maintenance of station level equipment for automatic fare collection (afc)system for cmrl phaseii corridor3 (sholinganallur to sipcot)and corridor 5(koyambedu to elcot park)
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) system for upgradation of existing navi mumbai metro line-1 network including back office. (on behalf of cidco)
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) system for upgradation of existing navi mumbai metro line-1 network including back office. (on behalf of cidco)
Read moreInstallation and testing of automatic fare collection system (afc) equipment at dmrc stations.
Installation and testing of automatic fare collection system (afc) equipment at dmrc stations.
Read moreSupply of hand held device along with development of ticketing application and integration with automatic fare collection (afc) system of dmrc.
Supply of hand held device along with development of ticketing application and integration with automatic fare collection (afc) system of dmrc.
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) gates for different operational stations in existing phase i, ii and iii network of dmrc.
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) gates for different operational stations in existing phase i, ii and iii network of dmrc.
Read moreDesign manufacture supply installation, testing and commissioning of automatic fare collection afc system for line 6 swami samarth nagar to vikhroli eeh of mumbai metro rail project of mmrda
Design manufacture supply installation, testing and commissioning of automatic fare collection afc system for line 6 swami samarth nagar to vikhroli eeh of mumbai metro rail project of mmrda
Read moreSupply, installation, testing and commissioning of s-afc (semi-automatic fare collection) system for priority corridor of patna metro rail project (isbt station to malahi pakri.)
Supply, installation, testing and commissioning of s-afc (semi-automatic fare collection) system for priority corridor of patna metro rail project (isbt station to malahi pakri.)
Read moreof your Industry type