Tender Details
Particulars | Details |
---|---|
Title |
New Construction Of 4x4 M 5 Cell Box Culvert Protection Work Approach Road And Additional Approach Road In Village Hasanpur Nausara And Gopalpur Thathiura Between Garai Nala In Block Dadraul
|
Description |
New Construction Of 4x4 M 5 Cell Box Culvert Protection Work Approach Road And Additional Approach Road In Village Hasanpur Nausara And Gopalpur Thathiura Between Garai Nala In Block Dadraul
|
Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
Tender Id | 2025_CEBLY_1023759_1 |
Reference Number |
1553/142C(E-Tender)-3/24 Dt 10-02-2025 |
Tender Fee | 2725 |
EMD | 17 Lakh |
Tender Value | |
Place | Shahjahanpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1848572 |
Start Date | March 31, 2025 14:30 |
End Date |
05/04/2025 ( Expired 63 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreWork of m and r of various acid drains, neutralizing pits and construction of 3 nos new acid drains in wtp btps
Work of m and r of various acid drains, neutralizing pits and construction of 3 nos new acid drains in wtp btps
Read moreConstruction of rcc covered drain in lieu of brick drain near sports complex of hq mb area and provn of rcc retaining wall and box type culvert at approach road of children school at manekshaw enclave in the area of age b/r-i under ge (west) jabalpur
Construction of rcc covered drain in lieu of brick drain near sports complex of hq mb area and provn of rcc retaining wall and box type culvert at approach road of children school at manekshaw enclave in the area of age b/r-i under ge (west) jabalpur
Read moreConstruction of concrete road approach road from tarkinata village to tarkinata causeway at kendangri gp under jamboni block in the district of jhargram (15th cfc)
Construction of concrete road approach road from&#x0d tarkinata village to tarkinata causeway at&#x0d kendangri gp under jamboni block in the district of&#x0d jhargram (15th cfc)
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreMcw and cc road head work at fsd tuensang for the year 2025 26 sh construction of approach road with pavers block
Mcw and cc road head work at fsd tuensang for the year 2025 26 sh construction of approach road with pavers block
Read moreConstruction of pmc work from badaya road to hasanpur dalit basti in rani ki sarai, patel nagar. (length- 1100 m)
Construction of pmc work from badaya road to hasanpur dalit basti in rani ki sarai, patel nagar.&#x0d (length- 1100 m)&#x0d
Read moreof your Industry type