Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Roof Top Rain Water Harvesting Jawahar Inter College Seetalkund, Akola Agra
|
| Description |
Construction Of Roof Top Rain Water Harvesting Jawahar Inter College Seetalkund, Akola Agra
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPMID_813024_1 |
|
Reference Number |
298/MI/TENDER/RWH/2023-24 |
| Tender Fee | 677 |
| EMD | 27000 |
| Tender Value | - |
| Place | SEMI OFFICE MEERUT |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | June 17, 2023 15:30 |
| End Date |
Expired
22/06/2023
Expired 1207 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreConstruction of rain water harvesting structures (rwhs) in sathupalli municipality.
Construction of rain water harvesting structures (rwhs) in sathupalli municipality.
Read moreConstruction of rain water harvesting pit at reddy avenue in bhandari layout ward 275 in nizampet circle-58, quthbullapur zone, cmc
Construction of rain water harvesting pit at reddy avenue in bhandari layout ward 275 in nizampet circle-58, quthbullapur zone, cmc
Read moreRaising of compound wall epdm flooring open gym area, rain water harvesting pits and repairs to toilets at kavuri hills park 1 and kavuri hills park 2 of ward no 232, madhapur circle-50, kp zone, cmc
Raising of compound wall epdm flooring open gym area, rain water harvesting pits and repairs to toilets at kavuri hills park 1 and kavuri hills park 2 of ward no 232, madhapur circle-50, kp zone, cmc
Read moreConstruction of rain harvesting pits ,kerb painting and no parking signage boards/painting at various locations as a part of praja palana-pragati pranalika 99 days action plan under goshamahal div-30, gz,ghmc (rs. 3.40 lakhs) (recall)
Construction of rain harvesting pits ,kerb painting and no parking signage boards/painting at various locations as a part of praja palana-pragati pranalika 99 days action plan under goshamahal div-30, gz,ghmc (rs. 3.40 lakhs) (recall)
Read moreDevelopment of madhapur graveyard in harijana basti by providing of burning unit, pooja mandap, dimpudu kallam, kerb walls, seating galleries, lord siva statue, ash storage room, wood storage room, toilet blocks, rain water harvesting pit etc, in ward no.232, madhapur circle-50, kukatpally zone
Development of madhapur graveyard in harijana basti by providing of burning unit, pooja mandap, dimpudu kallam, kerb walls, seating galleries, lord siva statue, ash storage room, wood storage room, toilet blocks, rain water harvesting pit etc, in ward no.232, madhapur circle-50, kukatpally zone
Read moreMaintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Maintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreConstruction of roof top rain water harvesting shri gandhi smarak inter college jengara , akola agra
Construction of roof top rain water harvesting shri gandhi smarak inter college jengara , akola agra
Read moreConstruction of roof top rain water harvesting rbs inter college bichpuri agra
Construction of roof top rain water harvesting rbs inter college bichpuri agra
Read moreof your Industry type