Tender Details
Particulars | Details |
---|---|
Title |
Dr.Nttps
|
Description |
Overhaul Works On Boiler Pressure Parts For Replacement Of Eroded Water Wall ,Dnp,Sh,Platen Sh Tubes, Carrying Out Cracked Fin Welding Where Ever Required During D Meter Survey, Cleaning And Clearing The Debris And Inspecting The Orifices Inside The Bottom Ring Header Of Boiler Of Unit 7/Stage Iv/Dr.Nttps During Annual Overhaul Period 2025 26
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1523 |
EMD | 21510 |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | May 13, 2025 17:00 |
End Date |
19/05/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dr.nttps
Procurement of vibrator sheeve and motor sheeve for trf make vibrating screens tm16 in crusher house
Read moreDr.nttps
Arresting of coal powder leaks and hot air leaks, cleaning of oil/grease in mills area, scaffolding works, monitoring of segregation works and thread cleaning of liner bolts etc. of unit 56 ball tube mills during the year 2025-26.
Read moreDr.nttps-repairs servicing of rolling shutters, cleaning of inside platform of chimneys, water storage tanks, rain water downfall pipes and conference halls etc., at various locations elevations of power house complex building stage-i, ii iii, miscellaneous civil maintenance works for the year 2025-26.
Dr.nttps-repairs servicing of rolling shutters, cleaning of inside platform of chimneys, water storage tanks, rain water downfall pipes and conference halls etc., at various locations elevations of power house complex building stage-i, ii iii, miscellaneous civil maintenance works for the year 2025-26.
Read moreDr.nttps-providing civil works for erection of a new lift in the t.g.building of stage-iiiii location.
Dr.nttps-providing civil works for erection of a new lift in the t.g.building of stage-iiiii location.
Read moreDr.nttps
Removal supply and application of spray insulation to hpt ipt hpcvs no. 1 and 2 hp esvs no. 1 and 2 and ipt iv s 1 and 2 etc mineral wool mattresses and aluminium cladding for hpt ipt connected pipelines steam strainers etc in unit7 during coh 2025 26.
Read moreDr.nttps
Overhaul works on boiler pressure parts for replacement of eroded water wall ,dnp,sh,platen sh tubes, carrying out cracked fin welding where ever required during d meter survey, cleaning and clearing the debris and inspecting the orifices inside the bottom ring header of boiler of unit-7/stage-iv/dr.nttps during annual overhaul period 2025-26
Read moreDr.nttps
Changing of damaged pf line coupling gaskets including erection of temporary platform at different elevations and temporary locking of mill outlet elbows and dismantling of the platforms and removing the locking arrangements of moes after changing the gaskets, dismantling of pf line shut off gates/ fuel inlet elbows (fie) and re-erection of new/repaired fuel inlet elbow and refixing of broken hanger supports during annual overhaul period 2025-26 and fy 2025-26
Read moreof your Industry type