Tender Details
Particulars | Details |
---|---|
Title |
Cleaning Of Earth/Coal/Debris/Base Line Pillar In Between 2 Nos. Of Belt Conveyor 1016 And 1017 End Of Conveyor And 40 Nos. Of Pillar In All Coal Stock Yard Under Chp Cpp, Piparwar Area
|
Description |
Cleaning Of Earth/Coal/Debris/Base Line Pillar In Between 2 Nos. Of Belt Conveyor 1016 And 1017 End Of Conveyor And 40 Nos. Of Pillar In All Coal Stock Yard Under Chp Cpp, Piparwar Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_298509_1 |
Reference Number |
Mgr.(O)/CHP/PPR/23-24/04 |
Tender Fee | 0 |
EMD | 8500 |
Tender Value | |
Place | CHP-CPP,PIPARWAR |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309206 |
Start Date | January 15, 2024 22:30 |
End Date |
23/01/2024 ( Expired 457 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of existing sprinkler pipe line at coal stock yard surroundings at amalgamated yekona i and ii oc mine at yekona sub area of majri area.
Repairing of existing sprinkler pipe line at coal stock yard surroundings at amalgamated yekona i and ii oc mine at yekona sub area of majri area.
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreDi/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th
Di/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th
Read moreErection and dismantling of lighting line and light fitting in ob faces, ob dumps, coal faces, haul roads in quarry 1, 3, 4, all offices and workshops of south quarry, ilbl ocp, lakhanpur area, mcl.
Erection and dismantling of lighting line and light fitting in ob faces, ob dumps, coal faces, haul roads in quarry 1, 3, 4, all offices and workshops of south quarry, ilbl ocp, lakhanpur area, mcl.
Read moreUpkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Read moreOt40renewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor #9 walkways and on the compound wall of new yard in chp area of mtps-ii
Renewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor #9 walkways and on the compound wall of new yard in chp area of mtps-ii.
Read moreDaily cleaning sweeping within the nai sabzi mandi gurugram. all the toilets, clearing, removal of blockage in water closet, sewerage line and staff quarter area within nvm, gurugram are to be cleaned daily dump the garbage, mud and dust daily by his
Daily cleaning sweeping within the nai sabzi mandi gurugram. all the toilets, clearing, removal of blockage in water closet, sewerage line and staff quarter area within nvm, gurugram are to be cleaned daily dump the garbage, mud and dust daily by his
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreManpower assistance for fire fighting in different coal stock yard and benches of dipka expansion project of dipka area
Manpower assistance for fire fighting in different coal stock yard and benches of dipka expansion project of dipka area
Read moreRepairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp
Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp
Read moreof your Industry type