Tender Details

Particulars Details
Title
Cleaning Of Earth/Coal/Debris/Base Line Pillar In Between 2 Nos. Of Belt Conveyor 1016 And 1017 End Of Conveyor And 40 Nos. Of Pillar In All Coal Stock Yard Under Chp Cpp, Piparwar Area
Description
Cleaning Of Earth/Coal/Debris/Base Line Pillar In Between 2 Nos. Of Belt Conveyor 1016 And 1017 End Of Conveyor And 40 Nos. Of Pillar In All Coal Stock Yard Under Chp Cpp, Piparwar Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_298509_1
Reference
Number
Mgr.(O)/CHP/PPR/23-24/04
Tender Fee 0
EMD 8500
Tender Value
Place CHP-CPP,PIPARWAR
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309206
Start Date January 15, 2024 22:30
End Date

23/01/2024 ( Expired 457 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of existing sprinkler pipe line at coal stock yard surroundings at amalgamated yekona i and ii oc mine at yekona sub area of majri area.

Repairing of existing sprinkler pipe line at coal stock yard surroundings at amalgamated yekona i and ii oc mine at yekona sub area of majri area.

Read more
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Read more
Di/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th

Di/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th

Read more
Erection and dismantling of lighting line and light fitting in ob faces, ob dumps, coal faces, haul roads in quarry 1, 3, 4, all offices and workshops of south quarry, ilbl ocp, lakhanpur area, mcl.

Erection and dismantling of lighting line and light fitting in ob faces, ob dumps, coal faces, haul roads in quarry 1, 3, 4, all offices and workshops of south quarry, ilbl ocp, lakhanpur area, mcl.

Read more
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .

Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .

Read more
Ot40renewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor #9 walkways and on the compound wall of new yard in chp area of mtps-ii

Renewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor #9 walkways and on the compound wall of new yard in chp area of mtps-ii.

Read more
Daily cleaning sweeping within the nai sabzi mandi gurugram. all the toilets, clearing, removal of blockage in water closet, sewerage line and staff quarter area within nvm, gurugram are to be cleaned daily dump the garbage, mud and dust daily by his

Daily cleaning sweeping within the nai sabzi mandi gurugram. all the toilets, clearing, removal of blockage in water closet, sewerage line and staff quarter area within nvm, gurugram are to be cleaned daily dump the garbage, mud and dust daily by his

Read more
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026

Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026

Read more
Manpower assistance for fire fighting in different coal stock yard and benches of dipka expansion project of dipka area

Manpower assistance for fire fighting in different coal stock yard and benches of dipka expansion project of dipka area

Read more
Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp

Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise