Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
External Coloring Works To Gm Office
|
| Description |
Providing External Coloring Works To Gm Office (Except Civil Department) At Krishna Colony, Bhupalpalli.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 503659 |
|
Reference Number |
BHP/CVL/ET-40/2167/2023-24 |
| Tender Fee | 208 |
| EMD | 5900 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | February 25, 2024 00:00 |
| End Date |
Expired
11/03/2024
Expired 944 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Conducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Conducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Read moreProviding external electrification to residential latyout of muda at sy no 6/1, 5/1 at kunjathbail in mangaluru urban development authority limits
Providing external electrification to residential latyout of muda at sy no 6/1, 5/1 at kunjathbail in mangaluru urban development authority limits
Read moreProviding of courier service from gm office,yellandu area to all mines and departments including koyagudem oc mine and kothagudem for a period of 2 years
Providing of courier service from gm office,yellandu area to all mines and departments including koyagudem oc mine and kothagudem for a period of 2 years
Read moreM and r works to 3 and 4 incline quarters, gm office, area workshop, mrs, ctl and old ctc at 3 incline, kothagudem area for the year 2026-27
M and r works to 3 and 4 incline quarters, gm office, area workshop, mrs, ctl and old ctc at 3 incline, kothagudem area for the year 2026-27
Read moreDesign, development, implementation of works module software for all works undertaken by hmwssb (single integrated module) along with training, implementation support and maintenance for a period of two(02) years under gm(it).
Design, development, implementation of works module software for all works undertaken by hmwssb (single integrated module) along with training, implementation support and maintenance for a period of two(02) years under gm(it).
Read moreI) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
I) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
Read moreMaintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Maintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Read moreSupply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreExternal coloring works to gm office
Providing external coloring works to gm office (except civil department) at krishna colony, bhupalpalli.
Read moreof your Industry type