Tender Details

Particulars Details
Title
Ktps V Cam Transportation Of Material, T And P, Ms Erw Pipes, Various Scrap Material, Ash, Coal, Silt And Debris Etc By Engaging Tractor (Including Carrier) From Section Store To Ash Pond / Internal Transportation From One Spot To Another Spot At Ash Pond And Inside Plant Premises As And When Required As Per The Directions Of In Charge Engineer At Site, During The Period From 01 04 2025 (Or From Actual Date Of Utilization) To 31 03 2026 Reg.
Description
Ktps V Cam Transportation Of Material, T And P, Ms Erw Pipes, Various Scrap Material, Ash, Coal, Silt And Debris Etc By Engaging Tractor (Including Carrier) From Section Store To Ash Pond / Internal Transportation From One Spot To Another Spot At Ash Pond And Inside Plant Premises As And When Required As Per The Directions Of In Charge Engineer At Site, During The Period From 01 04 2025 (Or From Actual Date Of Utilization) To 31 03 2026 Reg.
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 587543
Reference
Number
e-05/25-26/CAM/SE/OM/V Stage
Tender Fee 177
EMD 7478
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date April 10, 2025 00:20
End Date

23/04/2025 ( Expired 17 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ktps-vvi stages

Transportation of fly ash and wet ash from various locations in ash handling system by means of manual loading and disposing to ash pond or low laying areas in ktps complex as and when required during the period from 01.04.2025 or from actual date of commencement to 31.03.2026

Read more
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Read more
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Read more
Ktps-v-cam-transportation of material, tp, ms erw pipes, various scrap material, ash, coal, silt debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg.

Read more
Removal of wet ash from d5, d6, d7 drains and sedimentation tank

Ktps-v vi stage -civil-o m-i- removal and disposal of wet ash, silt, debris from d5, d6,d7 drain and sedimentation tank chambers and disposal of dry ash deposits near sedimentation tank to ash pond of ktps-vi stage as and when required for the period from 01.04.2025 or from actual date of commencement to 30.09.2025.

Read more
Engaging tractor for utilization at ktps-vi.stage power house area

Ktps v vi stages-civil-o m-i-engaging of tractor with 2.5cum capacity hydraulic lift carrier along with driver for utilization at ktps vi stage area, ash pond or wherever necessary as and when required for a period of 01.04.2025 to 31.03.2026.

Read more
Engaging tractor for utilization at ktps-v.stage power house area

Earmarked for sc/st/waddera/sagara labour cooperative societies and individual-ktps v vi stage-o m-i-civil-engaging tractor with 2.5cum capacity hydraulic lift carrier including driver for utilization at ktps v stage power house area, ash pond area or wherever necessary as and when required for the period from 01.04. 2025 to 31.03.2026.

Read more
Ktps-vvi stages

Engaging of jeep along with driver on hire basis for a mileage upto 2500 km/ month and usage time of 24 hrs/day for unit emergencies and transportation of petty materials under the control of divisional engineer/ general/ktps vi stage for the period from 01.04.2025 or from actual date of utilization to 31.03.2026

Read more
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Read more
Ktps-vvi stages

Providing of 01no. tractor with 2.5cum capacity hydraulic lift carrier including driver salary with all leads and lifts and incidental charges etc towards transportation of wet ash, debris, scrap materials etc within or outside plant premises and for transport of materials from indoor and outdoor stores to different work locations and from transport go downs as and when required as per the directions of engineer in charge from 01.04.2025 (or actual date of utilization) to 31.03.2026 for the usage of ktps v and vi stages.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise