Tender Details

Particulars Details
Title
Dismantling, Shifting And Installation Of Two Numbers Of Boom Barriers From Korba Are To Newly Proposed Location At Chhal Ocm.
Description
Dismantling, Shifting And Installation Of Two Numbers Of Boom Barriers From Korba Are To Newly Proposed Location At Chhal Ocm.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_327191_1
Reference
Number
SECL/GM/RGH/EnM/e-Tender/24-25 /27 Date 29/01/2025
Tender Fee 0
EMD 4000
Tender Value
Place Raigarh Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339135
Start Date January 30, 2025 15:30
End Date

06/02/2025 ( Expired 101 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.

Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.

Read more
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.

Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.

Read more
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Sup of veg and fruit fresh and ice at sd timarpur incl del points for the pd from 01 oct 2025 to 30 sep 2026

Sup of veg and fruit fresh and ice at sd timarpur incl del points for the pd from 01 oct 2025 to 30 sep 2026

Read more
Sup of veg and fruit fresh at 3 wing af and hq wac for the pd from 01 oct 2025 to 30 sep 2026

Sup of veg and fruit fresh at 3 wing af and hq wac for the pd from 01 oct 2025 to 30 sep 2026

Read more
Design, supply, installation and commissioning with three (03) years comprehensive maintenance of dynamic creative illumination at maithon and panchet dam and various fountains proposed at maithon dam

Design, supply, installation and commissioning with three (03) years comprehensive maintenance of dynamic creative illumination at maithon and panchet dam and various fountains proposed at maithon dam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise