Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Provision Of Replacement Of Upholstery Of Sofa, Chairs Etc. In Ac Section Eastern Court, New Delhi.
|
Description |
Provision Of Replacement Of Upholstery Of Sofa, Chairs Etc. In Ac Section Eastern Court, New Delhi.
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2025_BSNL_224729_1 |
Reference Number |
60/EE/BCD-II/AB/ND/2024-25 |
Tender Fee | 177 |
EMD | 1134 |
Tender Value | |
Place | Delhi |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=251330 |
Start Date | January 24, 2025 14:30 |
End Date |
01/02/2025 ( Expired 154 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authority engineer for supervision of new construction of major bridge with approaches from km 0.000 to 1.200 madhopur -badabanta section of nh-20 in the state of odisha
Consultancy services for authority engineer for supervision of new construction of major bridge with approaches from km 0.000 to 1.200 madhopur -badabanta section of nh-20 in the state of odisha
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreRepair to pathways, curve stone, passage, plinth protection, saucer drain, storm drain, compound wall etc and misc b/r nature work in the area of age b/r-ii under ge west delhi cantt-10
Repair to pathways, curve stone, passage, plinth protection, saucer drain, storm drain, compound wall etc and misc b/r nature work in the area of age b/r-ii under ge west delhi cantt-10
 
Read moreRenovation and modernisation of existing 33 11kv ss in entire state of assam
Renovation and modernization (r a m) of existing 33/11 kv sub-stations with replacement of defective/dilapidated switchgears, auto reclosures and other equipments, with civil works including construction of control room building etc. in assam
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreReplacement of damaged ac roof sheets and side sheets in chp and main plant area at ghtp lehra mohabat
Replacement of damaged ac roof sheets and side sheets in chp and main plant area at ghtp lehra mohabat
Read moreDeployment of maintenance team in gorakhpur- deoria sadarbhatni, gorakhpur-kaptanganj -valmikinagar, kaptanganj- padrauna section including lmc (rkm 201) for maintenance of ofc cable network, wi-fi, vss network and associated equipment etc
Deployment of maintenance team in gorakhpur- deoria sadarbhatni, gorakhpur-kaptanganj -valmikinagar, kaptanganj- padrauna section including
 lmc (rkm 201) for maintenance of ofc cable network, wi-fi, vss network and
 associated equipment etc
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreof your Industry type