Tender Details
Particulars | Details |
---|---|
Title |
Improvement With Widening Road From Odr 77 To Sangawade Nrusinha Temple Road Vr 114 Km. 1/500 To 2/00 Tal Karveer Dist Kolhapur.
|
Description |
Improvement With Widening Road From Odr 77 To&Amp#X0d
Sangawade Nrusinha Temple Road Vr 114 Km. 1/500 To 2/00 Tal&Amp#X0d
Karveer Dist Kolhapur.
|
Organisation | Public Works Region-Pune | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1860 |
EMD | 71000 |
Tender Value | |
Place | Works |
Link |
AAAAAAAAAA Login to view |
Start Date | May 22, 2025 15:30 |
End Date |
29/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreProviding pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Providing pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Read morePeriodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Periodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Read morePr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Read moreImprovement to arale -bhogamwadi -chavanwadi road ch 2/00 to 2/500 (vr 64 tal-karveer dist-kolhapur (gramin raste sudharana karane -3054)
Improvement to arale -bhogamwadi -chavanwadi road ch 2/00 to 2/500 (vr 64 tal-karveer dist-kolhapur (gramin raste sudharana karane -3054)
Read moreImprovement of road from sawarde to shivaji nagar road k.m. 00/00 to 03/500 at-sawarde taluka-hatkanangale dist-kolhapur
Improvement of road from sawarde to shivaji nagar road k.m. 00/00 to 03/500 at-sawarde taluka-hatkanangale dist-kolhapur
Read moreof your Industry type