Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Site Package A2 (Civil Works) For Extension Of 765 K V Orai Substation (Shifting And Con Of 765k V Fixed Line Reactor To Bus Reactor) Under Western Region Expansion Scheme Xxxiii (Wres Xxxiii): Part C1
|
Description |
Site Package A2 (Civil Works) For Extension Of 765 K V Orai Substation (Shifting And Con Of 765k V Fixed Line Reactor To Bus Reactor) Under Western Region Expansion Scheme Xxxiii (Wres Xxxiii): Part C1
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 24796 |
Reference Number |
NR3/NT/W-CIVIL/DOM/K00/24/14070 |
Tender Fee | 5000 |
EMD | 2.73 Lakh |
Tender Value | |
Place | Orai |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=e2c872d9-30a1-4f6e-ba34-07f04bc4ed35 |
Start Date | October 19, 2024 01:30 |
End Date |
11/11/2024 ( Expired 221 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read morePre-bid tie up for 765kv ais new substation package ss112t for (a) establishment of 765/400/220 kv morena ps (south of sabalgarh) (b) extension of 765/400/220 kv karera s/s associated with transmission system for evacuation of power from re projects in morena sez in madhya pradesh-phase i (2500mw) through tariff based competitive bidding (tbcb) route prior to rfp bid submission by powergrid to bpc.
Pre-bid tie up for 765kv ais new substation package ss112t for (a) establishment of 765/400/220 kv morena ps (south of sabalgarh) (b) extension of 765/400/220 kv karera s/s associated with transmission system for evacuation of power from re projects in morena sez in madhya pradesh-phase i (2500mw) through tariff based competitive bidding (tbcb) route prior to rfp bid submission by powergrid to bpc.
Read more765kv ais new substation package ss 118t for a) establishment of 765-400 kv shadnagar station b) extension of 400kv shadnagar (tgtransco) c) extension of 400kv kethiredipally (tgtransco) associated with transmission system for kurnool-iv rez - phase-ii (3 gw) through tbcb route
765kv ais new substation package ss 118t for a) establishment of 765/400 kv shadnagar station b) extension of 400kv shadnagar (tgtransco) c) extension of 400kv kethiredipally (tgtransco) associated with transmission system for kurnool-iv rez - phase-ii (3 gw) through tbcb route
Read moreSite package part c extensionof fire hydrant system, hvws system work for3x110 mvar, 1 phase, 765kv bus reactor at 765 400 kvsub-station orai (jalaun)-u.p
Site package part c extensionof fire hydrant system, hvws system work for3x110 mvar, 1 phase, 765kv bus reactor at 765 400 kvsub-station orai (jalaun)-u.p
Read moreTransmission line package tl-01 lilo of both circuits of angul-sundargarh (jharsuguda) 765 kv 2xs/c lines at nlc-talabira generation switchyard associated with eastern region generation scheme-i (ergs-i) under tbcb route.
Transmission line package tl-01 lilo of both circuits of angul-sundargarh (jharsuguda) 765 kv 2xs/c lines at nlc-talabira generation switchyard associated with eastern region generation scheme-i (ergs-i) under tbcb route.
Read moreGeneral- con of deemed ht scheme into ht scheme by adding new 11 kv 500 kva substation, including ht pole structure, uts, ht/lt cabling, metering and mandatory electrical, mechanical and civil works as per electrical inspectorate standards at
Con of deemed ht scheme into ht by adding new 11 kv 500 kva substation, including ht pole structure, uts, ht/lt cabling, metering and mandatory electrical, mechanical and civil works as per electrical inspectorate standards at thiruvila
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Read moreExecution of balance civil works under substation extension package ss-110 (part-b)
Execution of balance civil works under substation extension package ss-110 (part-b)
Read moreQuantum of works involved for shifting of 11 kv line of feeder no-02 and feeder no-05 emainting from 33/11 kv substation shuklaganj unnao under edsd-i shuklaganj under divison-ii, unnao. against deposite scheme.
Quantum of works involved for shifting of 11 kv line of feeder no-02 and feeder no-05 emainting from 33/11 kv substation shuklaganj unnao under edsd-i shuklaganj under divison-ii, unnao. against deposite scheme.
Read moreConstruction of additional 1x50 mva 132 33 kv ptf with hv and lv bays along with extension of 33kv bus and 2 no of 33kv bay at 132kv dhule substation for ph4 and ph5 under sulwade jamphal kanoli lift irrigation scheme, tal dist dhule civil work
Construction of additional 1x50 mva 132 33 kv ptf with hv and lv bays along with extension of 33kv bus and 2 no of 33kv bay at 132kv dhule substation for ph4 and ph5 under sulwade jamphal kanoli lift irrigation scheme, tal dist dhule civil work
Read moreof your Industry type