Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Flood Protection Crate Bund Along Nakpoo Choo Nallah From Nangma Gongma To Mezat Nallah Part Ii
|
| Description |
Flood Protection Crate Bund Along Nakpoo Choo Nallah From Nangma Gongma To Mezat Nallah Part Ii
|
| Organisation | Union Territory of Ladakh |
| Tender Id | 2023_PWD_10842_4 |
|
Reference Number |
E-tender/63 of 2023-24-I-FC Kargil. |
| Tender Fee | 540 |
| EMD | 1.08 Lakh |
| Tender Value | |
| Place | Executive Engineer I and FC Division kargil |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in |
| Start Date | August 26, 2023 18:30 |
| End Date |
Expired
07/09/2023
Expired 1009 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of flood protection works on kahal jugasar near butt market dstream lhs of nallah fpw at diggi dudwar on kahal jugasar nallah fpw on kahal jugasar nallah near changa tawaie bridge at spot and construction of flood protection works
Construction of flood protection works on kahal jugasar near butt market dstream lhs of nallah fpw at diggi dudwar on kahal jugasar nallah fpw on kahal jugasar nallah near changa tawaie bridge at spot and construction of flood protection works
Read moreRrd to lwss kangain to thambu and its adjoining village in tehsil palampur and jaisinghpur distt. kangra (hp)
Providing wire crate on right bank of mandh khad from 17.50 to rd 27.50 mtrs
Read moreConstruction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Construction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Read moreImprovement to nallah/waterway from shree siddeshwar temple to the fields from ch.0.00 km to ch.1.50 km at paliem in v.p. ucassaim paliem punola in aldona constituency.
Improvement to nallah/waterway from shree siddeshwar temple to the fields from ch.0.00 km to ch.1.50 km at paliem in v.p. ucassaim paliem punola in aldona constituency.
Read moreHiring of jcb for removal of slips/debris and boulders from the wangtoo-bhaba power house road due to heavy rain or flood in pagal nallah during summer and winter season removal and disposal of muck,slips , dead animal in the premises of svp colony
Hiring of jcb for removal of slips/debris and boulders from the wangtoo-bhaba power house road due to heavy rain or flood in pagal nallah during summer and winter season removal and disposal of muck,slips , dead animal in the premises of svp colony
Read moreConstruction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh:- c/o 2 nos. company level bop at simna-ii and old sewaram para including internal electrification, installation i/c compound lights service connecton to buildings. (package-ii) (balance work)
Read moreConsultancy services for preparation of dpr for construction of road d-s-dbo from new to nhdl (ps) specification from km 0.00 to km 150.00 (in pkg i, ii, iii, iv and v) along eastern bank of shyok river in ut of ladakh
Consultancy services for preparation of dpr for construction of road d-s-dbo from new to nhdl (ps) specification from km 0.00 to km 150.00 (in pkg i, ii, iii, iv and v) along eastern bank of shyok river in ut of ladakh
Read moreUrgent raising of road from tyachguno road to paroda bridge junction along mdr-40 in v.p. paroda in cuncolim constituency.
Urgent raising of road from tyachguno road to paroda bridge junction along mdr-40 in v.p. paroda in cuncolim constituency.
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreof your Industry type