Tender Details

Particulars Details
Title
Repair, Maintenance, Dismantling, Shifting, Erection Of Ht And Lt Oh Lines And Strengthening Of Old/Damaged Pole Foundation By Pcc To Maintain Proper Power Supply At Different Working Districts, Hemm Equipment, Workshops, Pumping For Mine Dewatering,
Description
Repair, Maintenance, Dismantling, Shifting, Erection Of Ht And Lt Oh Lines And Strengthening Of Old/Damaged Pole Foundation By Pcc To Maintain Proper Power Supply At Different Working Districts, Hemm Equipment, Workshops, Pumping For Mine Dewatering,
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_290954_1
Reference
Number
PO/SG/EnM/Sirka/eNIT/23-24/11
Tender Fee -
EMD 21800
Tender Value -
Place PO Office Sirka Colliery
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date October 12, 2023 15:30
End Date
Expired 23/10/2023

Expired 1090 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu

(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu

Read more
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada

Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of 3.3kv oh line for power feeding to hemm shovel 419 at mine in respect of rohini project

Erection of 3.3kv oh line for power feeding to hemm shovel 419 at mine in respect of rohini project

Read more
Erection of 3.3kv oh line for power feeding to hemm lnt 171 at mine in respect of rohini project.

Erection of 3.3kv oh line for power feeding to hemm lnt 171 at mine in respect of rohini project.

Read more
Dismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp

Dismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp

Read more
Dismantling of poles and oh conductors of the 220 v oh line from different locations of mine, in respect of karo ocp, under bnk area.

Dismantling of poles and oh conductors of the 220 v oh line from different locations of mine, in respect of karo ocp, under bnk area.

Read more
Dismantling of poles and oh conductors of the 220 v oh line from different locations of mine, in respect of karo ocp, under bnk area

Dismantling of poles and oh conductors of the 220 v oh line from different locations of mine, in respect of karo ocp, under bnk area

Read more
Dismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.

Dismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise