Tender Details
About Tender
🚂 Procurement Opportunity: Brush Holder Support Assly 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Supply Of Brush Holder Support Assembly From Qualified Vendors. 🚂 📅 Bid Submission Deadline: April 05, 2024, 12:30 Pm Interested Vendors Must Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Tender Document For Complete Details. Keywords: Brush Holder Support Assembly, Ministry Of Railways, Central Government, Tender, Procurement, JabalpurParticulars | Details |
---|---|
Title |
Overhauling Kit Rr20070 Of(m) Elgi Ft. No. A7247 A609 Consisting Of 9 Items.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106290785 |
Reference Number |
20243070 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/012025/106582648/viewNitPdf_4838127.pdf |
Start Date | January 17, 2025 23:22 |
End Date |
27/01/2025 ( Expired 108 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreAnnual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Annual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Read moreRepairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read moreDemolition and reconstruction of bldg no p 9 to p 14 single or living accn at bikaner military station
Demolition and reconstruction of bldg no p 9 to p 14 single or living accn at bikaner military station
Read moreConstruction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreConstruction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreof your Industry type