Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Tender Announcement: Mtps I Bm Unit Iii Boiler Maintenance Services 🔥 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Maintenance Of Boiler Pressure Parts, Auxiliary Aids And Harnesses (Aah) For Unit Iii, With A Focus On The Maintenance Of Burners And The Replacement Of Worn Out Fasteners At Cover Plates. The Scope Includes Services For The Year 2024 As Per The Annual Maintenance Contract (Amc). 📅 Bid Submission Deadline: April 15, 2024, 2:00 Pm Interested Bidders Must Submit A Tender Security Of Inr 6800. No Tender Fee Is Payable. Proposals Should Encompass Detailed Methodologies, Equipment Specifications, And A Comprehensive Maintenance Plan To Ensure The Reliability And Efficiency Of The Boiler Pressure Parts. Keywords: Tneb Limited, Mtps I Bm Unit Iii, Boiler Maintenance, Auxiliary Aids And Harnesses, Burner Maintenance, Fasteners, State Govt. And Ut, Amc, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit Iii Boiler Pressure Parts Aoh 2024 Maintenance Of Burners And Replacement Of Worn Out Fasteners At Cover Plates
|
| Description |
Mtps I Bm Unit Iii Boiler Pressure Parts Aoh 2024 Maintenance Of Burners And Replacement Of Worn Out Fasteners At Cover Plates
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_422534_1 |
|
Reference Number |
CE/MTPS-I/SE/M-I/BM/OT.386/ 2023-24 |
| Tender Fee | 0 |
| EMD | 6800 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=502277 |
| Start Date | February 10, 2024 18:30 |
| End Date |
Expired
15/04/2024
Expired 913 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i bm unit ii boiler pressure parts aoh 2026 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Mtps i bm unit ii boiler pressure parts aoh 2026 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreTtps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreTtps mech ii bm unit iii renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2026 2027
Ttps mech ii bm unit iii renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2026 2027
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreNickel coating of worn out copper plates of moulds of slab caster # 6
Nickel coating of worn out copper plates of moulds of slab caster # 6
Read moreTtps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Read moreTtps mech ii bm unit iii repairing of worn-out skin casing inside the dog house and coutant bottom area in boiler during overhaul 2026 2027
Ttps mech ii bm unit iii repairing of worn-out skin casing inside the dog house and coutant bottom area in boiler during overhaul 2026 2027
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreRepair / replacement of worn out parts of budshah-ii dredger presently deployed at tulibal sopore.
Repair / replacement of worn out parts of budshah-ii dredger presently deployed at tulibal sopore.
Read moreof your Industry type