Tender Details

Particulars Details
Title
Labour Charges For Construction Of Spillway For Slit Detanriuon Dam / Water Body At Pilkhan Wala Khala
Description
Labour Charges For Construction Of Spillway For Slit Detanriuon Dam / Water Body At Pilkhan Wala Khala Ranjitpur Block
Organisation Haryana Government | State Govt. and UT
Tender Id 2024_HRY_344241_1
Reference
Number
Const of Spillway for SDD ,Water Body at Pilkhan Wala Khala Ranjitpur Block
Tender Fee 2000
EMD 12500
Tender Value -
Place ranjitpur Block
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=419391

Start Date January 12, 2024 23:30
End Date
Expired 23/01/2024

Expired 994 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Annual maintenance of the spillway, earthdam, sluice, saddle spillway and additional spillway at sathanur dam for the year 2026-2027.

Annual maintenance of the spillway, earthdam, sluice, saddle spillway and additional spillway at sathanur dam for the year 2026-2027.

Read more
Repair of dam spillway bucket no 2 using high performance concrete and repair of side walls of dam spillway no 2 using epoxy mortar at dul dam, dps, kishtwar

Repair of dam spillway bucket no 2 using high performance concrete and repair of side walls of dam spillway no 2 using epoxy mortar at dul dam, dps, kishtwar

Read more
General-dam safety- repair and maintenance work of spillway shutter no.1 at pothundy dam-rewinding of hoist motor and associated works of spillway shutter no. 1 at pothundy dam-general mechanical work

General-dam safety- repair and maintenance work of spillway shutter no.1 at pothundy dam-rewinding of hoist motor and associated works of spillway shutter no. 1 at pothundy dam-general mechanical work

Read more
Supply, transportation, erection of rubber seals of spillway radial gates# 01, 02 & 03 at dam site

Supply, transportation, erection of rubber seals of spillway radial gates# 01, 02 & 03 at dam site

Read more
Engaging watchmen, spillway/sluice operators and other manpower to lower mullamari dam for the year 2026-27

Engaging watchmen, spillway/sluice operators and other manpower to lower mullamari dam for the year 2026-27

Read more
Resectioning d/sslope of rt.dyke,impvt.to dam top d/s dwarf wall,long.and trs.drain on dam slope,restoration to toe drain,impvt.to rt dyke dam top road,const.of dg shed including colour washing to spillway,parapet,dwarf wall of derjang dam underdpiw

Resectioning d/sslope of rt.dyke,impvt.to dam top d/s dwarf wall,long.and trs.drain on dam slope,restoration to toe drain,impvt.to rt dyke dam top road,const.of dg shed including colour washing to spillway,parapet,dwarf wall of derjang dam underdpiw

Read more
Providing painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no.15 to 26 of almatti dam.

Providing painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no.15 to 26 of almatti dam.

Read more
Providing painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no. 1 to 14 of almatti dam

Providing painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no. 1 to 14 of almatti dam.

Read more
Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran

Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran

Read more
Maintaining stanley dam body wall and its approach road and inspection gallery and its approach roads at mettur dam for the period october 2026 to january 2027

Maintaining stanley dam body wall and its approach road and inspection gallery and its approach roads at mettur dam for the period october 2026 to january 2027

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise