Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Labour Charges For Construction Of Spillway For Slit Detanriuon Dam / Water Body At Pilkhan Wala Khala
|
| Description |
Labour Charges For Construction Of Spillway For Slit Detanriuon Dam / Water Body At Pilkhan Wala Khala Ranjitpur Block
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_344241_1 |
|
Reference Number |
Const of Spillway for SDD ,Water Body at Pilkhan Wala Khala Ranjitpur Block |
| Tender Fee | 2000 |
| EMD | 12500 |
| Tender Value | - |
| Place | ranjitpur Block |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=419391 |
| Start Date | January 12, 2024 23:30 |
| End Date |
Expired
23/01/2024
Expired 994 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance of the spillway, earthdam, sluice, saddle spillway and additional spillway at sathanur dam for the year 2026-2027.
Annual maintenance of the spillway, earthdam, sluice, saddle spillway and additional spillway at sathanur dam for the year 2026-2027.
Read moreRepair of dam spillway bucket no 2 using high performance concrete and repair of side walls of dam spillway no 2 using epoxy mortar at dul dam, dps, kishtwar
Repair of dam spillway bucket no 2 using high performance concrete and repair of side walls of dam spillway no 2 using epoxy mortar at dul dam, dps, kishtwar
Read moreGeneral-dam safety- repair and maintenance work of spillway shutter no.1 at pothundy dam-rewinding of hoist motor and associated works of spillway shutter no. 1 at pothundy dam-general mechanical work
General-dam safety- repair and maintenance work of spillway shutter no.1 at pothundy dam-rewinding of hoist motor and associated works of spillway shutter no. 1 at pothundy dam-general mechanical work
Read moreSupply, transportation, erection of rubber seals of spillway radial gates# 01, 02 & 03 at dam site
Supply, transportation, erection of rubber seals of spillway radial gates# 01, 02 & 03 at dam site
Read moreEngaging watchmen, spillway/sluice operators and other manpower to lower mullamari dam for the year 2026-27
Engaging watchmen, spillway/sluice operators and other manpower to lower mullamari dam for the year 2026-27
Read moreResectioning d/sslope of rt.dyke,impvt.to dam top d/s dwarf wall,long.and trs.drain on dam slope,restoration to toe drain,impvt.to rt dyke dam top road,const.of dg shed including colour washing to spillway,parapet,dwarf wall of derjang dam underdpiw
Resectioning d/sslope of rt.dyke,impvt.to dam top d/s dwarf wall,long.and trs.drain on dam slope,restoration to toe drain,impvt.to rt dyke dam top road,const.of dg shed including colour washing to spillway,parapet,dwarf wall of derjang dam underdpiw
Read moreProviding painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no.15 to 26 of almatti dam.
Providing painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no.15 to 26 of almatti dam.
Read moreProviding painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no. 1 to 14 of almatti dam
Providing painting by sandblasting method and replacement of rubber seals to the spillway radial crest gates no. 1 to 14 of almatti dam.
Read moreContretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Read moreMaintaining stanley dam body wall and its approach road and inspection gallery and its approach roads at mettur dam for the period october 2026 to january 2027
Maintaining stanley dam body wall and its approach road and inspection gallery and its approach roads at mettur dam for the period october 2026 to january 2027
Read moreof your Industry type