Tender Details
Particulars | Details |
---|---|
Title |
Const Of Road With Ef And Sg Along With Derha Centre To Thasobibar (Approx 3.5 Km) Under 15th Fc Untied Grant (2nd Installment) For The Year 2022 23
|
Description |
Dprd/Btc/(15th Fc)ut/V/Udl 15/2024/10
|
Organisation | Bodoland Territorial Council | State Govt. and UT |
Tender Id | 2025_BoTC_43344_1 |
Reference Number |
DPRD/BTC/(15th FC)UT/V/Udl-15/2024/10 |
Tender Fee | 915 |
EMD | 91098 |
Tender Value | |
Place | Mazbat Udalguri |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=69209 |
Start Date | March 10, 2025 16:00 |
End Date |
25/03/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreDesign, development and upgradation of existing water supply system along with other civil works with one year o andm for panagarg zone ii and wtp for 5.32 mgd capacity panagarh industrial park water supply scheme under dwsd, p.h.e. dte
Design, development and upgradation of existing water supply system along with other civil works with one year o andm for panagarg zone ii and wtp for 5.32 mgd capacity panagarh industrial park water supply scheme under dwsd, p.h.e. dte
Read moreMaintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division uring the year 2025-26 (group - i)
Maintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division uring the year 2025-26 (group - i)
Read moreSupply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Supply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Read moreCleaning of open rcc drains, pp lake drain and cutting of wild vegetation from pp guard house to tvs gate and along the security patrolling road inside barc , trombay, mumbai for year-2025-2026.
Cleaning of open rcc drains, pp lake drain and cutting of wild vegetation from pp guard house to tvs gate and along the security patrolling road inside barc , trombay, mumbai for year-2025-2026.
Read moreConst of drain and cc road st from ho sudip paul to ho prasanta paul at shibnagar lotus club under ward no 21 amc 2nd call
Const of drain and cc road st from ho sudip paul to ho prasanta paul at shibnagar lotus club under ward no 21 amc 2nd call
Read moreof your Industry type