Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road From Ranchi Khunti Road In Devi Mandap Road Pugadu To Anand Mahato House Via Lal Kali Nath Shahdev House And Partially In Santranji Under Ward No 53
|
Description |
Construction Of Road From Ranchi Khunti Road In Devi Mandap Road Pugadu To Anand Mahato House Via Lal Kali Nath Shahdev House And Partially In Santranji Under Ward No 53
|
Organisation | UDD Secretary | State Govt. and UT |
Tender Id | 2024_UDD_88065_7 |
Reference Number |
183/ENG |
Tender Fee | 11800 |
EMD | 88000 |
Tender Value | |
Place | As per NIT |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=118524 |
Start Date | July 11, 2024 00:25 |
End Date |
25/07/2024 ( Expired 310 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreof your Industry type