Tender Details

Particulars Details
Title
Providing Labour Component During Assembly Period 2023 At Milk Scheme Premises, Civil Line, Nagpur
Description
Providing Labour Component During Assembly Period 2023 At Milk Scheme Premises, Civil Line, Nagpur
Organisation Government of Maharashtra
Tender Id 2023_PWR_958507_1
Reference
Number
pwc/ngp/div1/S66-4RAC/2023-24
Tender Fee 590
EMD 11000
Tender Value -
Place Executive Engineer Public Works Division No.1, Nag
Link
View Original Tender Notice

https://mahatenders.gov.in

Start Date October 30, 2023 23:15
End Date
Expired 06/11/2023

Expired 1070 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Award of contract for supply of milk to area hospital, rkp for a period of two (02) years.

Award of contract for supply of milk to area hospital, rkp for a period of two (02) years.

Read more
Establishment of hi-tech nandini milk parlour in the premises of rcs office,ali askar road,vasanth nagar, bengaluru

Establishment of hi-tech nandini milk parlour in the premises of rcs office,ali askar road,vasanth nagar, bengaluru.

Read more
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Read more
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Read more
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27

Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Constructiion of compound wall at milk scheme premises, civil line nagpur tah. ngpur distt. nagpur..

Constructiion of compound wall at milk scheme premises, civil line nagpur tah. ngpur distt. nagpur..

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise