Tender Details

About Tender

🚂 Procurement Opportunity: Carriage Repair Services For Bg Poh Coaches 🛠️ The Ministry Of Railways, Central Government, Invites Bids From Experienced Service Providers For The Dismantling, Stripping, Repairing, Handling, And Re Fitment Of Seats/Berths In Bg Poh Coaches. 🚅 📅 Bid Submission Deadline: April 26, 2024, 11:00 Am Emd: Inr 23,08,000 Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Scope Of Work, Specifications, And Submission Guidelines. Keywords: Carriage Repair, Bg Poh Coaches, Ministry Of Railways, Central Government, Tender, Repair Services, Bhavnagar, Mumbai
Particulars Details
Title
Dismantling, Stripping, Repairing, Handling And Re Fitment Of Seat/Berth Of Bg Poh Coaches In Carriage Repair Workshop, Bhavnagar Para As Per Scope Of Work For 24 Months
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74344186
Reference
Number
BVPW-2023-24-Seat-42
Tender Fee 0
EMD 2.31 Lakh
Tender Value
Place Mumbai
Link https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74344186/viewNitPdf_4521722.pdf
Start Date April 02, 2024 23:22
End Date

26/04/2024 ( Expired 386 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Appointment of an organization to provide data entry operator for a period of 2 months in 24 department as per 01 each offices of assessment and collection depatment

Appointment of an organization to provide data entry operator for a period of 2 months in 24 department offices as per 01 each for making data entry through the&amp#x0d available records.

Read more
Offloading work to outside agency for repairing and vulcanization of 80 nos trailing cable joints on as and when required basis during 2 years duration in 24 96 draglines of dudhichua project

Offloading work to outside agency for repairing and vulcanization of 80 nos trailing cable joints on as and when required basis during 2 years duration in 24 96 draglines of dudhichua project

Read more
Fabrication of pontoon and pump shed and repairing of pontoon work for the purpose of dewatering and fire fighting operations as per requirement on the instruction of engineer-in-charge for a period of one year at kaniha ocp, kaniha area.

Fabrication of pontoon and pump shed and repairing of pontoon work for the purpose of dewatering and fire fighting operations as per requirement on the instruction of engineer-in-charge for a period of one year at kaniha ocp, kaniha area.

Read more
Offloading work for repairing of oval mounting holes of base plate and rack segments with alignment of rack segments and fitment of barrel bolts and joint studs in 24 96 pawan dragline of dudhichua project

Offloading work for repairing of oval mounting holes of base plate and rack segments with alignment of rack segments and fitment of barrel bolts and joint studs in 24 96 pawan dragline of dudhichua project

Read more
Special repair of geeta chownk (rotary sec-5,6,7,8) including special repair of water fountain , civil work and running operation maintenance and watch and ward for 12 month complete in all respect as per site requirement

Special repair of geeta chownk (rotary sec-5,6,7,8) including special repair of water fountain , civil work and running operation maintenance and watch and ward for 12 month complete in all respect as per site requirement

Read more
Special repair of geeta chownk (rotary sec-5,6,7,8) including special repair of water fountain , civil work and running operation maintenance and watch and ward for 12 month complete in all respect as per site requirement

Special repair of geeta chownk (rotary sec-5,6,7,8) including special repair of water fountain , civil work and running operation maintenance and watch and ward for 12 month complete in all respect as per site requirement

Read more
1.rep of complete oil cooler tube welding, gauging, cleaning with dismantling, mounting and repair work of all front, fitment work of drill. no. 936. 2.repairing of damaged pto opening, dismantling and re-assembling drill sl. no.853.

1.rep of complete oil cooler tube welding, gauging, cleaning with dismantling, mounting and repair work of all front, fitment work of drill. no. 936. 2.repairing of damaged pto opening, dismantling and re-assembling drill sl. no.853.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise