Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔨 Procurement Opportunity: Chipping Hammer With Spring Handle 🔨 The Department Of Heavy Industry, Under The Ministry Of Heavy Industries And Public Enterprises, Is Seeking Bids For The Supply Of Chipping Hammers With Spring Handles. 🛠️ 🗓️ Submission Deadline: April 20, 2024, 10:00 Am Bidders Must Provide Detailed Specifications, Pricing, And Delivery Schedules. The Procurement Will Be Based On The Highest Quality And Cost Effectiveness. Keywords: Chipping Hammer, Spring Handle, Procurement, Industrial Tools, Government Tender, Heavy Industry| Particulars | Details |
|---|---|
| Title |
Chipping Hammer With Spring Handle
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2024/B/4838423 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 10, 2024 14:35 |
| End Date |
Expired
20/04/2024
Expired 896 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
LAKSHIKA ENTERPRISES
61950
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | D.R.ENGINEERS | Make : WELSPRING Model : CHIMPING HAMMER Title : CHSHH - Chipping Hammer | 18-04-2024 19:07:24 | MII | Qualified |
| 2 | LAKSHIKA ENTERPRISES | Make : Chipping Hammer Model : Chipping Hammer Title : Chipping Hammer | 20-04-2024 08:53:19 | MII | Qualified |
| 3 | Zenith Enterprises | Make : BEST MAKE Model : CHIPPING HAMMER Title : CHIPPING HAMMER | 20-04-2024 01:40:11 | MII | Qualified |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Chipping Hammer | 350 | ₹ 61950.000 |
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type