Tender Details
Particulars | Details |
---|---|
Title |
Improvements To Nit To Lotus Colony Road From Km 0/0 To 1/8, Division No.49 Of Gwmc Limits In Hanumakonda District
|
Description |
Improvements To Nit To Lotus Colony Road From Km 0/0 To 1/8, Division No.49 Of Gwmc Limits In Hanumakonda District
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 580992 |
Reference Number |
Chief Engineer(RB) State Roads, CRN e NIT No. 2425/KMNR/DCE( R)EE-R/DEE-1/AEE/2025, Dt:07-03-2025 |
Tender Fee | 11800 |
EMD | 5.68 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | March 13, 2025 01:30 |
End Date |
19/03/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreConsultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Consultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Read moreConsultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Consultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Read moreUpgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode
Upgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode
Read moreof your Industry type