Tender Details
Particulars | Details |
---|---|
Title |
Hwpt/Elec/Mp/Fire Barrier Ph Ii/2024/161
|
Description |
Supply And Fixing Of Fire Barriers On Cable Racks And Cable Entry Openings Of Main Plant ,Spp Plant Phase Ii At Heavy Water Plant, Tuticorin.
|
Organisation | Heavy Water Board | Central Govt. Ministry/Department |
Tender Id | 2024_HWB_831226_1 |
Reference Number |
HWPT/ELEC/MP/Fire Barrier PH-II/2024/161 |
Tender Fee | 0 |
EMD | 31960 |
Tender Value | |
Place | Heavy Water Plant, Tuticorin |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=873460 |
Start Date | October 18, 2024 17:00 |
End Date |
30/11/2024 ( Expired 192 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreRepair maintenance of choloronome plant solar water heaters and servicing of dg sets at water supply installations and misc items at sector c under ge utility ambala
Repair maintenance of choloronome plant solar water heaters and servicing of dg sets at water supply installations and misc items at sector c under ge utility ambala
Read moreBiennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Read more8125/sar-t-14/2025-26 provn of concertina coil and allied works on boundary wall and main gate of er-ii section at af stn sarsawa under ge (af) sarsawa
Provn of concertina coil and allied works on boundary wall and main gate of er-ii section at af stn sarsawa under ge (af) sarsawa
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreCanal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Read moreHeight raising of plant boundary wall near guard pond (approx 150 meter long) and supplying, fitting, fixing of rbt concertina fencing on boundary wall at different locations, stps.
Height raising of plant boundary wall near guard pond (approx 150 meter long) and supplying, fitting, fixing of rbt concertina fencing on boundary wall at different locations, stps.
Read moreof your Industry type