Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
For Various Ancillary Work For Smooth Operation Of Belt Conveyor In Seam C At Kurja Ug Mine. For Quantity 1399950m Of Nine Month Time Period
|
| Description |
For Various Ancillary Work For Smooth Operation Of Belt Conveyor In Seam C At Kurja Ug Mine. For Quantity 1399950m Of Nine Month Time Period
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_341956_1 |
|
Reference Number |
AGM/HSD/GM(O)/e-Tend/25-26/20 dtd 22.08.2025 |
| Tender Fee | 0 |
| EMD | 1.2 Lakh |
| Tender Value | - |
| Place | SECL Hasdeo Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=354475 |
| Start Date | August 23, 2025 15:30 |
| End Date |
Expired
20/09/2025
Expired 389 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreMaintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read moreTransportation and installation of 1000mm belt conveyor in proposed 70lw lhd dev. district in v-top seam at baherabandh ug mine of hasdeo area.
Transportation and installation of 1000mm belt conveyor in proposed 70lw lhd dev. district in v-top seam at baherabandh ug mine of hasdeo area.
Read moreConstruction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Read moreWhite washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
Read moreConstruction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Read moreConstruction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Construction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Read moreCleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Cleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Read moreCarriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Carriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Read moreConstruction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Construction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Read moreof your Industry type