Tender Details

Particulars Details
Title
Construction Of Earthwork And Structure For Alternate Road Affected Due To Submergence Of Dhamani M.I Tank Taluka Karanja Dist. Washim.
Description
Construction Of Earthwork And Structure For Alternate Road Affected Due To Submergence Of Dhamani M.I Tank Taluka Karanja Dist. Washim.
Organisation CE-Water Resources Dept. Amravati | State Govt. and UT
Tender Id 2025_CEWRA_1165269_3
Reference
Number
E-TENDER NOTICE 15 FOR 2024-25
Tender Fee 2860
EMD 42500
Tender Value
Place DHAMANI M.I.TANK KARANJA LAD
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2025462
Start Date March 28, 2025 15:30
End Date

04/04/2025 ( Expired 38 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of bypass road to rayagada town and jk pur town on nh-326 in the state of odisha.

Construction of bypass road to rayagada town and jk pur town on nh-326 in the state of odisha. &#x0d (bid ref no. 10 ce nh of 2024-25)&#x0d

Read more
Tender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.

Tender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.

Read more
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in

Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in

Read more
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Read more
Construction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode

Construction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Construction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward

Construction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of cc road and rcc drain from bus stand to ripta pul

Construction of cc road and rcc drain from bus stand to ripta pul

Read more
Construction of c.c. road and drain from qamar house to liyaqat house at nagar panchayat kursath unnao

Construction of c.c. road and drain from qamar house to liyaqat house at nagar panchayat kursath unnao

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise